BLD98-03705
| BLD-Footing | 3/11/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 11:37:30. Contact: . col ftg/pile cap ok pend report. 3/14/2002 11:20:51 AM
|
MEC02-00712
| Pressure Test | 3/12/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 15:13:12. Contact: ###-####. ok by gas co. 3/14/2002 9:43:22 AM
|
MEC02-00712
| Final | 3/12/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 15:13:54. Contact: ###-####.
|
BLD01-00594
| BLD-Conference | 3/13/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | PASS |
|
|
###-#### DAVE will bond landscape. 3/14/2002 11:13:01 AM
|
BLD02-00366
| BLD-Framing/Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | FAIL |
|
|
###-#### MARK c/n, fireblocks, hangers, etc...ok to insul. 3/14/2002 10:44:21 AM
|
BLD00-03538
| BLD-Final | 3/13/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | CANC |
|
|
###-#### MEL resched. per contractor. 3/14/2002 11:22:56 AM
|
BLD01-03163
| BLD-Conference | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/14/2002 10:05:37 AM w/ framer re firewall req's; need shearwall hdwe installed; wip. Spoke w/ truss manuf'r re rough handling of trusses (Sta-Rite Truss) at delivery...chk trusses for damege at full frame insp.
|
BLD00-03538
| BLD-Final | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/14/2002 11:17:22 AM ###-####
|
BLD01-00675
| BLD-Conference | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/14/2002 1:50:51 PM ...w/ rick j re insps...no struct insps noted. 3/14/2002 3:13:43 PM
|
BLD00-01649
| BLD-Conference | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/14/2002 3:10:18 PM dbl door astragal smoke-fire seals ok
|
BLD01-03156
| BLD-Foundation | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PART |
|
|
found rob ###-####
|
BLD02-00107
| BLD-Final | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | CANC |
|
|
###-#### rick--cancel per rick
|
BLD02-00377
| BLD-Foundation | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PASS |
|
|
###-#### jed hold downs & steel in 3/14/2002 5:05:56 PM
|
BLD02-00107
| BLD-Framing/Rough-in | 3/14/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PART |
|
|
rick- ###-#### fr; framing ok, add gyp at north eave, chk at final 3/14/2002 3:39:21 PM
|
BLD01-03163
| BLD-Framing/Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 12:00:00 AM | P | PART |
|
|
JUSTIN ###-#### 3rd fl int side fire walls, fireblocks in at 10' horiz. intervals 3/14/2002 11:24:13 AM
|