Inspections for the day of: Friday, March 14, 2003.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-00221 Groundwork3/13/20033/14/20033/14/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 3/13/2003 at 12:34:39 PM. Contact: ###-####. need to change two inch cross to 3x2 cross as required by upc 706.2 where inlet,s enter at the same level ( barrel size need,s to be two size,s larger ) 3/14/2003 12:20:26 PM
PLM03-00308 Groundwork3/13/20033/14/20033/14/2003 12:00:00 AMAPART
PLEASE DO A PARTIAL GROUNDWORK INSPECTION FOR THE CENTER PART OF THE BUILDING, MID AM FRIDAY 3/14/03. THANKS CHRIS.; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL kit area groundwork test ok 3/14/2003 12:34:59 PM
PLM03-00658 Plumbing Rough-in3/13/20033/14/20033/14/2003 12:00:00 AMAFAIL
###-#### need to change vent,s for combination waste and vent system from two to tthree inch also need to provide upper chamber vent on flammable liquid interceptor 3/14/2003 12:08:35 PM
PLM02-02202 Final3/13/20033/14/20033/14/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/13/2003 at 12:24:41 PM. Contact: ###-####. home owner to pull new permit when financially able to afford to install dishwasher 3/14/2003 2:00:21 PM
PLM03-00347 Final3/14/20033/14/20033/14/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/14/2003 at 7:52:35 AM. Contact: ###-####.
PLM03-00664 Water and/or Sewer3/14/20033/14/20033/14/2003 12:00:00 AMPPASS
###-####
PLM03-00269 Final3/14/20033/14/20033/14/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/14/2003 at 10:58:13 AM. Contact: ###-####.
PLM03-00652 Sprinkler (Final)3/14/20033/14/20033/14/2003 12:00:00 AMPPASS
bruce; Phone #: ###-#### Internet Inspection Request from: Annette Moore