Inspections for the day of: Wednesday, March 14, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-00454 FIRE-Final Inspection3/14/20073/14/20073/15/2007 11:31:41 AMPFAIL
Smoke alarms need to be relocated to atleast 3' away from the bathroom doors. All other items are ok.
BLD05-00453 FIRE-Final Inspection3/14/20073/14/20073/15/2007 11:30:12 AMPFAIL
Smoke alarms need to be relocated to atleast 3' away from the bathroom doors. All other items are ok.
FIR06-00958 INSP-Sprinkler Rough-in/Hydro3/14/20073/14/20073/15/2007 11:27:32 AMPPASS
The remaining underground supply and FDC piping is ok to cover. Both passed their hydro testes
FIR07-00081 INSP-Final Inspection3/14/20073/14/20073/14/2007 2:54:17 PMPDONE
Conference was for the storage room. The existing wall mounted device is blocked by product on the shelf and by the storage rack in the middle of the room. I agreed with steve that a ceiling mounted device would be adequate as long as the kept the storage 18" below the ceiling as per code. That way the ceiling mounted device would be viewable in all areas.
BLD06-01234 FIRE-Final Inspection3/14/20073/14/20073/14/2007 2:17:39 PMPFAIL
Sprinkler heads are overspace in two of the new offices and one pendant is overspaced outside fo the new offices at the east wall. A sprinkler permit will be required for this work. Life safety will be ok to final when sprinkler work is complete.
BLD06-01234 FIRE-Sprinkler Rough-in3/14/20073/14/20073/14/2007 2:17:05 PMPFAIL
Sprinkler heads are overspace in two of the new offices and one pendant is overspaced outside fo the new offices at the east wall. A sprinkler permit will be required for this work. Life safety will be ok to final when sprinkler work is complete.
FIR07-00121 INSP-Sprinkler Rough-in/Hydro3/13/20073/14/20073/14/2007 11:35:38 AMAPASS
Sprinkler piping is ok to cover but one hanger infront of the refrigerator is attached to duct work and will need to be relocated to the building structure.