BLD05-02158
| FIRE-Final Inspection | 3/11/2008 | 3/12/2008 | | A | |
|
|
|
FIR07-00235
| INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/17/2008 11:39:58 AM | A | PASS |
|
|
Noted corrections verified for completion, fire sprinkler permit finaled.
|
FIR07-00837
| INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/14/2008 4:45:56 PM | P | PART |
|
|
Final pending site map at the panel reflecting correct device addresses.
|
FIR07-00942
| INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/14/2008 4:45:07 PM | P | PART |
|
|
Fire alarm testing passed, missing site map at the panel indicating location and addresses of initiating devices.
|
FIR08-00124
| INSP-Sprinkler Rough-in | 3/13/2008 | 3/14/2008 | 3/14/2008 3:46:40 PM | P | PART |
|
|
Sprinkler rough-in at the office area hard lid ceilings is approved for cover, noted one head to be installed under the stairway combustible concealed space, sidewinder sammy screws for hanger attatchments must be installed per manufacturers listing requirements, new DP heads at the beer cooler are acceptable as installed pending the addition of three heads where refrigeration units block coverage. NOTE: The existing ESFR upright heads at the warehouse area have been compromised by the placement of new insulation and backing at the roof deck resulting in sprinkler obstruction and violation of the head listing, permit will not be finaled until this situation is corrected.
|
FIR06-00365
| INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/14/2008 1:52:40 PM | A | PART |
|
|
Noted this is the wrong permit number requested for inspection-apparently intended for overhead work for the phase two building. Completed sprinkler monitoring testing for flows, tampers and floor control valves, noted one painted head at the first floor entryway, no other areas inspected at this time.
|
FIR08-00121
| INSP-Conference | 3/12/2008 | 3/14/2008 | 3/14/2008 1:32:28 PM | P | FAIL |
|
|
Per contractor, the required off site monitoring account has not been initiated. Final system testing and acceptance cannot be completed until monitoring is on line-see fire code review note #2 for details. Prior to final inspection the NFPA 72 "Inspection and Testing Form" fig. 10.6.2.3 must be completed including a copy of the supervising station signals report.
|
FIR08-00179
| INSP-Sprinkler Rough-in | 3/13/2008 | 3/14/2008 | 3/14/2008 1:03:48 PM | A | PART |
|
|
OH fire sprinkler system modifications are approved for cover at tenant remodel area ceilings.
|
FIR06-00595
| INSP-Alarm Testing | 3/13/2008 | 3/14/2008 | 3/14/2008 12:43:13 PM | A | PART |
|
|
Site inspection completed with respect to atrium beam detectors and smoke evacuation. Functional testing is satisfactory, approval pending verification of design data in correlation to actual test results.
|
FIR08-00169
| INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/14/2008 10:42:10 AM | A | FAIL |
|
|
Need plan and field modifications to include the sprinklers at the restrooms and electrical closet to remain.
|
FIR08-00157
| INSP-Sprinkler Rough-in/Hydro | 3/14/2008 | 3/14/2008 | 3/14/2008 10:12:02 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
FIR08-00157
| INSP-Final Inspection | 3/14/2008 | 3/14/2008 | 3/14/2008 12:00:00 AM | P | PASS |
|
|
Final inspection complete. KR
|
BLD07-02747
| FIRE-Final Inspection | 3/13/2008 | 3/14/2008 | 3/13/2008 2:17:20 PM | A | CANC |
|
|
joe - fire life safety - please call 1 hr prior to inspection Phone #: ###-####
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 3/12/2008 | 3/14/2008 | 3/12/2008 5:20:27 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 3/12/2008 at 2:51:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 12 2008 5:20PM.
|