Inspections for the day of: Monday, March 14, 2011.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00513 INSP-Sprinkler Rough-in3/11/20113/14/20113/16/2011 1:51:20 PMAPASS
The sprinkler piping above the ceilings in the combustible areas is ok to cover.
FIR10-00655 INSP-Final Inspection3/14/20113/14/20113/14/2011 3:04:28 PMPPASS
Permit finaled.
FIR10-00579 INSP-Sprinkler Rough-in/Hydro3/14/20113/14/20113/14/2011 3:03:23 PMPPASS
The wet system hydro test passed.
FIR11-00078 INSP-Sprinkler Rough-in3/11/20113/14/20113/14/2011 1:27:34 PMAPASS
Sprinkler piping is ok to cover.
BLD11-00090 FIRE-Final Inspection3/11/20113/14/20113/14/2011 12:53:35 PMAPASS
life safety passed