Inspections for the day of: Monday, March 14, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00910 General Inspection3/14/20113/14/20113/15/2011 3:03:46 PM PASS
ESC11-00096 Site Preparation3/14/20113/14/20113/15/2011 1:43:03 PM NR
ESC11-00091 Site Preparation3/7/20113/14/20113/14/2011 3:39:18 PMANR
ESC11-00109 Site Preparation3/10/20113/14/20113/14/2011 3:23:41 PMADONE
Staging equiptment but will not begin until tomorrow. will re-inspect on 3/15/2011
ESC10-00618 General Inspection3/11/20113/14/20113/14/2011 2:47:08 PMAPASS
ESC10-00619 General Inspection3/11/20113/14/20113/14/2011 2:46:42 PMAPASS
ESC11-00111 Site Preparation3/14/20113/14/20113/14/2011 2:22:58 PM NR
ESC11-00117 Conference3/11/20113/14/20113/14/2011 2:12:58 PMPDONE
REFER TO INSPECTOR 420 NOTES.
ESC11-00100 Site Preparation3/7/20113/14/20113/14/2011 2:12:01 PMANR
ESC10-00847 General Inspection3/14/20113/14/20113/14/2011 2:11:49 PM PASS
No run off coming from the lot.
ESC10-00754 Random Inspection3/14/20113/14/20113/14/2011 2:11:22 PMAFAIL
Verbal to RP:
Replace the sediment barrier at the front of the project behind the guttter pan.
ESC10-00814 Tracking Control3/11/20113/14/20113/14/2011 2:10:32 PMAFAIL
Spoke with RP and told him he must restrict the construction traffic to one side and more frequently sweep up all hard surfaces.
ESC10-00444 BMP Violation3/14/20113/14/20113/14/2011 10:37:15 AMAFAIL
Verbal to RP:
Install a sediment barrier along the back of gutter pan. Will reinspect on 3/16/2011AM.
ESC10-00853 General Inspection3/14/20113/14/20113/14/2011 10:31:09 AM PASS
ESC11-00102 Site Preparation3/10/20113/14/20113/14/2011 9:46:04 AMPFAIL
Verbal to RP:
Install the additional BMP's to the project areathat are shown on the ESC plan map that was approved per Boise City Erosion Control. (Storm drain inlet protection, Filtrex sock on curb cut out, and stabilized construction exits)
** Will allow the exits to be constructed with 2" cruched concrete. If it starts to be broken down dur to traffic the RP is required to do a top dressing of 2" or greater washed rock or 2" or greater basalt angular rock.
Install all storm drain inlet protection per the manufactures specifications.
Clean up all sediment deposits on the hard surfaces. Will re-inspect on 3/15/2011AM.