Inspections for the day of: Wednesday, March 14, 2012.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00408 General Inspection3/8/20123/8/2012   
BLD11-01652 BLD-Final3/14/20123/14/20123/15/2012 1:35:56 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin
BLD11-01364 BLD-Final3/13/20123/14/20123/14/2012 2:20:50 PMACANC
after troy Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin
BLD11-01364 BLD-Final3/14/20123/14/20123/14/2012 2:20:39 PMPPASS
BLD11-01364 DOC - Permit Finaled3/14/20123/14/20123/14/2012 2:20:30 PMPPASS
ESC12-00092 General Inspection3/14/20123/14/20123/14/2012 1:51:12 PMPPASS
BLD12-00223 BLD-Framing/Rough-in3/13/20123/14/20123/14/2012 1:50:58 PMPPASS
steve Phone #: ###-####
BLD11-02955 BLD-Final3/13/20123/14/20123/14/2012 10:49:36 AMAPASS
the way in is thru the garage lift key pad door to the first click put code (3020 send) then door will open or call me if it does not work @ ###-####
Phone #: ###-#### >> Inspection requested via web by Matthew Howard
BLD11-02955 DOC - Permit Finaled3/14/20123/14/20123/14/2012 10:49:27 AMPPASS
BLD12-00475 BLD-Footing3/13/20123/14/20123/14/2012 10:31:01 AMAPASS
Mike Phone #: ###-####
GCB12-00008 GCB-Final3/9/20123/14/20123/14/2012 10:01:12 AMAPASS
Erby @ ###-####Call for access. All issues have been resolved. No card to sign. Structural final only ok.
GCB11-00061 GCB-Final3/13/20123/14/20123/14/2012 9:46:02 AMAFAIL
John @ ###-####Call for access. Provide the required energy cert. and post. provide blower door test results and post or the third party check list. Correction notice posted.