FIR13-00011
| INSP-Sprinkler Rough-in | 3/11/2013 | 3/12/2013 | | P | |
|
|
This is for the 3rd, 4th & 5th Fl. Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00011
| INSP-Sprinkler Rough-in | 3/13/2013 | 3/14/2013 | 3/14/2013 5:33:03 PM | P | PART |
|
|
6th floor rough-in completed. Noted missing coverage at the SE corner, beam obstruction at the fire service elevator lobby.
|
BLD13-00055
| FIRE-Final Inspection | 3/14/2013 | 3/14/2013 | 3/14/2013 5:27:07 PM | P | FAIL |
|
|
Missing exit signs per plan red-lines, provide EM lighting at the new door, must meet IFC conditions for delayed egress.
|
BLD13-00175
| FIRE-Final Inspection | 3/13/2013 | 3/14/2013 | 3/14/2013 5:24:41 PM | A | FAIL |
|
|
Provide "door to remain unlocked.." signage at the main entry/exit, post one 2A10BC rated fire extinguisher, provide current certification for the K class PFE. Existing type one hood appears overdue inspection, nozzles do not match equipment layout- enclosed pizza oven only.
|