ESC14-00091
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 4:04:34 PM | | PASS |
|
|
Idaho Power staging area looks good. No trackout or sediment leaving site. Permit is posted across the street. Actual work is occuring in the ACHD R.O.W. in Foothills East.
|
ESC14-00107
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 11:34:25 AM | | FAIL |
|
|
No MS4 structures in area, and no major violations. Permit is posted, and area of disturbance is well contained. Dirt from driveway has tracked onto street. Talked to Quality Concrete employee about sweeping today. He said they will do it this afternoon. Called RP (not onsite) to reinforce the verbal CN
|
ESC13-00793
| Tracking Control | 3/14/2014 | 3/14/2014 | 3/14/2014 11:05:48 AM | P | PASS |
|
|
Staging area looks good. Corrections issued for the main site.
|
ESC13-00755
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 10:58:03 AM | | FAIL |
|
|
Perimeter of Terraces looks good, but need to sweep roundabout to Warm Springs and replenish construction entrance and drain puddle that is inside site before construction entrance.
Verbal CN issued to Petra RP Preston. History of response to corrections has been postive so far.
|
ESC13-00069
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 10:54:26 AM | | PART |
|
|
Permit is for underground garage at the Terraces. There are 3 seperate ESC permits:
ESC13-00069 - garage on main site ESC13-00755 - entire main site ESC13-00793 - laydown/staging yard
Need to sweep up roundabout to Warm Springs and replenish construction entrance to main site. Also should try to drain puddle on the inside of the entrance.
Verbal CN issued to Preston to complete by
|
ESC14-00092
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 10:45:19 AM | P | PART |
|
|
Follow-up insptection of Brighton Homes' sites in River Heights #5. No new violations and trackout. Re-inspection fee has not been paid for the two SWOs posted this week. If not paid next week, will put hold on Brighton ESC site preps.
Left voicemail for RP Josh Edwards.
|
ESC13-01220
| Site Preparation | 3/13/2014 | 3/14/2014 | 3/14/2014 10:25:39 AM | A | PASS |
|
|
Clint Phone #: ###-####
Site is ready for excavation. Cement washout for townhomes is located two lots to the west. Triplett Ranch BMPs currently sufficient.
|
ESC14-00109
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 10:18:55 AM | | PASS |
|
|
No trackout to Warm Springs from site. Pipe is being installed to cover the irrigation ditch, which is currently not flowing. No corrections required.
|
ESC14-00075
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 10:09:33 AM | | PASS |
|
|
Appears that concrete for water line has been cut. BMPs still in place on DI's. Unclear if geothermal line has been installed. No trackout or stockpiles on street observed. Some work on going at the back of pool. No corrections required.
|
ESC13-00537
| Random Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 9:40:32 AM | A | PASS |
|
|
WWTP Phosphorus plant is in progress. Building is primarily made of concrete, observed large capacity washout in use by concrete trucks. No trackout to access road or rest of plant. Approved.
|
ESC13-00886
| General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 9:02:09 AM | | PASS |
|
|
|