Inspections for the day of: Tuesday, March 14, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01279 General Inspection3/14/20173/14/20173/14/2017 4:08:54 PM PASS
Silt fence is installed. Spoke with RP Kyle on site this morning construction entrance will be installed this week. Rest of subdivision has some slight trackout. Subdivision okay.
ESC16-00488 General Inspection3/14/20173/14/20173/14/2017 3:27:33 PM PASS
No trackout. project ok.
ESC16-00556 General Inspection3/10/20173/14/20173/14/2017 3:27:00 PMPPASS
Work on roads is in progress. SWPPP inspection are up to date. Some minor maintenance needed on silt fence. Left message with RP Jeff asking for timeline on installing DI bags and reminding about use of concrete washout once concrete work begins. No trackout sign is posted. Project okay.
ESC15-01627 Site Final3/14/20173/14/20173/14/2017 2:18:28 PMPPASS
Okay
ESC15-01627 Aging Inspection3/14/20173/14/20173/14/2017 2:18:14 PM PASS
Garage is finished and vegetation and driveway are complete. Okay to final ESC.
ESC16-00865 General Inspection3/14/20173/14/20173/14/2017 2:06:41 PMPPASS
Grading appears to be complete and ready for roads. No trackout. No ESC corrections.
ESC16-00697 General Inspection3/14/20173/14/20173/14/2017 1:51:47 PMPPASS
DI protection OK. Trash containment good. No trackout onto road. No corrections requested.
ESC16-00699 General Inspection3/14/20173/14/20173/14/2017 1:51:36 PM PASS
DI protection OK. Trash containment good. No trackout onto road. No corrections requested.
ESC16-00698 General Inspection3/14/20173/14/20173/14/2017 1:51:23 PM PASS
DI protection OK. Trash containment good. No trackout onto road. No corrections requested.
ESC16-00345 Site Final3/14/20173/14/20173/14/2017 1:25:25 PMPPASS
Okay to final
ESC16-00345 Aging Inspection3/14/20173/14/20173/14/2017 1:24:40 PM PASS
Earthwork appears complete. soil is stable. Okay to final.
ESC15-00403 General Inspection3/14/20173/14/20173/14/2017 9:40:50 AM PASS
To obtain ESC site final need to remove small dirt pile in corner of parking lot and trash.
ESC17-00025 General Inspection3/13/20173/14/20173/14/2017 9:32:23 AMPPASS
Perimeter control wattles are in place. Sign is posted.
Corrections requested stake and trench wattles, install construction entrance or implement frequent sweeping of track out, use the concrete washout, if using adjacent site of access stockpiling clean trackout next to adjacent site.
Talked with RP Rollo and requested corrections.
Okay to continue work.
ESC17-00025 Site Preparation3/14/20173/14/20173/14/2017 9:31:34 AMPFAIL
Did not call in site preparation inspection before digging.