BLD01-03161
| BLD-Framing/Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 13:34:01. Contact: .
|
BLD00-02158
| BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
###-#### Joe ###-#### Joe final ok 3/15/2002 4:32:15 PM
|
BLD01-02401
| BLD-Foundation | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
###-#### SCOTT top out pending special insp report. 3/15/2002 1:50:49 PM
|
BLD00-03428
| BLD-Conference | 3/13/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
for conf calvin ###-#### walk through with r jackson/ work inprogess./ plm common coridor wall and sofit need pre rock/ ele box protection/ transpher duct openings reduced/ 2 hr shaft next to rotunda maintaned at beam seats. 3/15/2002 1:50:01 PM
|
BLD01-00646
| BLD-Framing/Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 11:09:19. Contact: ###-####. framing ok 2 & 3 floors 3/15/2002 3:26:05 PM
|
BLD00-02159
| BLD-Final | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 301 On 3/15/2002 4:19:52 PM final ok 3/15/2002 4:32:26 PM
|