MIS02-00029
| BLD-Conference | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
block & tie ###-####. ok to skirt. 3/15/2002 11:04:08 AM
|
MIS02-00049
| BLD-Conference | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
shawn ###-####. ok to skirt blocking ok. 3/15/2002 11:22:08 AM
|
BLD01-01956
| BLD-Framing/Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 16:15:31. Contact: .
|
MEC02-00745
| Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
r/i ben frisbee ###-#### about 80% complete most all work will be exposed.Told them to call when completed for re-inspection. 3/15/2002 1:05:24 PM
|
MEC02-00742
| Pressure Test | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-00704
| Pressure Test | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PASS |
|
|
###-#### RANDY OR ###-#### CELL
|
BLD01-03169
| BLD-Final | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 08:20:42. Contact: ###-####. Ok for a temp oc , pending plumbing approval. 3/15/2002 4:41:59 PM
|
BLD01-01180
| BLD-Final | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PASS |
|
|
fn re-insp- ###-####- john--key on top of meter box will open side gar door
|