BLD02-00499
| BLD-Conference | 3/13/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
###-#### ben
ok on framing (already covered, non bearing walls) after trades are signed off 3/15/2002 10:19:33 AM
|
MEC02-00738
| Conference | 3/13/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PART |
|
|
###-#### Ben Conf only
ok on rouph, chk heaters and vents for proper installation later 3/15/2002 10:22:06 AM
|
BLD01-01167
| BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-02999
| BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | FAIL |
|
|
fn occ rick -###-####
c/n posted 3/15/2002 11:59:33 AM
|
BLD01-01174
| BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
###-#### TRAVIS GARAGE CODE 0912
|
MEC02-00039
| Final | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 415 On 3/15/2002 11:16:05 AM
|
BLD01-02346
| BLD-Footing | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 08:32:58. Contact: ###-####.
|
BLD02-00231
| BLD-Foundation | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | NR |
|
|
###-#### ED
steel not in yet, forms not in place 3/15/2002 3:06:24 PM
|
MEC02-00657
| Rough-in | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 10:21:56. Contact: ###-####. need clearance on B vent 3/15/2002 2:36:14 PM
|
MEC02-00657
| Pressure Test | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 10:22:29. Contact: ###-####.
|
BLD01-01167
| BLD-Final | 3/15/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | FAIL |
|
|
890----9730 call 1 st 3/15/2002 10:29:02 AM
|
BLD01-02489
| BLD-Conference | 3/14/2002 | 3/15/2002 | 3/15/2002 12:00:00 AM | P | PART |
|
|
###-####
shear ok, patio ok to cover, ok to extend permit, need plumbing rouph and re-call frame inspection. 3/15/2002 2:34:59 PM
|