FIR03-00806
| INSP-Sprinkler Rough-in | 3/12/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | A | PASS |
|
|
Main rough-in ok 3/15/2004 10:08:31 AM
|
FIR03-00659
| INSP-Sprinkler Rough-in/Hydro | 3/12/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | A | FAIL |
|
|
Earth quaking is not quite finished at north drop down at second floor offices 3/15/2004 3:28:47 PM
|
FIR03-00569
| INSP-Alarm Testing | 3/15/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | PASS |
|
|
fire alarm finaled 3/15/2004 4:20:58 PM
|
MIS04-00082
| FIR-Final | 3/15/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | PASS |
|
|
fire life safety inspection OK 3/15/2004 8:58:51 AM
|
FIR04-00079
| INSP-Sprinkler Rough-in | 3/15/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | PART |
|
|
Sprinklers under stairs are ok to cover 3/15/2004 2:51:44 PM
|
BLD03-01798
| FIRE-Final Inspection | 3/15/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | CANC |
|
|
fire life safety final already given 3/15/2004 2:49:57 PM
|
BLD03-01107
| FIRE-Final Inspection | 3/15/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled
|
FIR04-00094
| INSP-Sprinkler Rough-in/Hydro | 3/12/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | FAIL |
|
|
two heads off of a 1" outlet over the restrooms 3/15/2004 4:22:25 PM
|
FIR03-00523
| INSP-Alarm Testing | 3/12/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | FAIL |
|
|
Still need to test the fire sprinklers and duct smoke detectors. Provide breaker lock on the new panel. Provide as-builts with the updated device addresses to the owner and the inspector. Provide NFPA 72 forms. Smoke detector in cell 736 is overspaced. 3/15/2004 2:49:08 PM
|
BLD03-00686
| FIRE-Final Inspection | 3/12/2004 | 3/15/2004 | 3/15/2004 12:00:00 AM | P | FAIL |
|
|
fire alarm and fire sprinkler not finaled yet. Life safety inspection not done 3/15/2004 2:45:14 PM
|