BLD05-03391
| BLD-Conference | 3/15/2006 | 3/15/2006 | 3/15/2006 5:13:40 PM | P | DONE |
|
|
vlad; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Met with Plumb Contr. Talked about where he can bore holes in floor joists. Looked at footing for CMU wall near elevator lift.
|
BLD05-03118
| BLD-Energy code compliance | 3/15/2006 | 3/15/2006 | 3/15/2006 5:11:30 PM | P | PASS |
|
|
scott ###-####
|
BLD05-03311
| BLD-Energy code compliance | 3/15/2006 | 3/15/2006 | 3/15/2006 4:42:36 PM | P | PASS |
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-03233
| BLD-Final | 3/15/2006 | 3/15/2006 | 3/15/2006 3:08:29 PM | P | PASS |
|
|
please call when on way//dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa C/C issued
|
BLD05-03088
| BLD-Final | 3/14/2006 | 3/15/2006 | 3/15/2006 2:11:41 PM | P | PASS |
|
|
Cory -- pending ele final, fire sprinkler final and life safety final (all scheduled 3-15-06 AM); Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong OK for Perm Occ. :)
|
BLD05-02838
| BLD-Framing/Rough-in | 3/14/2006 | 3/15/2006 | 3/15/2006 10:04:27 AM | A | PASS |
|
|
Rudy -- for exterior shear strap and interior tie down to finish rest of walls; inspection was somehow missed ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD06-00321
| BLD-Foundation | 3/14/2006 | 3/15/2006 | 3/15/2006 9:03:34 AM | A | PASS |
|
|
James; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-01690
| BLD-Framing/Rough-in | 3/13/2006 | 3/15/2006 | 3/15/2006 8:49:42 AM | A | PART |
|
|
Pat -- wall concrete placement for filtrate tanks; pouring concrete at noon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Center section of South wall includes "T" section measuring 15'x15'x15'. 4000lb psi concrete required. Test results on previously poured sections at 7 day coming in at around 5800psi.
|