FIR06-01002
| INSP-Sprinkler Rough-in/Hydro | 3/14/2007 | 3/15/2007 | 3/15/2007 5:57:15 PM | P | PART |
|
|
Fire sprinkler install is good for cover at the restroom hard lids and the entryway vestibule soffits as noted on approved plans, will require as-builts reflecting all field modifications.
|
FIR05-00268
| INSP-Final Inspection | 3/15/2007 | 3/15/2007 | 3/15/2007 5:52:49 PM | P | PASS |
|
|
UG supply line permit finaled.
|
FIR06-00683
| INSP-Final Inspection | 3/15/2007 | 3/15/2007 | 3/15/2007 5:51:27 PM | P | PASS |
|
|
UG supply line permit finaled.
|
FIR06-00583
| INSP-Sprinkler Rough-in | 3/15/2007 | 3/15/2007 | 3/15/2007 5:50:24 PM | P | PART |
|
|
OH install is approved for cover at the waiting room, nurses station, north hall and as noted on city stamped plans.
|
FIR06-00770
| INSP-Sprinkler Rough-in | 3/15/2007 | 3/15/2007 | 3/15/2007 1:38:44 PM | P | PART |
|
|
Rough-in as marked on approved plans is good for cover.
|
FIR07-00176
| INSP-Final Inspection | 3/8/2007 | 3/15/2007 | 3/15/2007 1:15:30 PM | A | PASS |
|
|
Fire alarm permit work passed final field inspection.
|
FIR05-00402
| INSP-Final Inspection | 3/14/2007 | 3/15/2007 | 3/15/2007 1:14:42 PM | A | PASS |
|
|
Final fire sprinkler inspection passed, noted missing escutcheons installed while on site.
|
FIR06-00671
| INSP-Final Inspection | 3/13/2007 | 3/15/2007 | 3/15/2007 11:04:32 AM | A | PASS |
|
|
Required corrections have been field verified for compliance, final fire sprinkler inspection passed, permit finaled.
|
BLD06-03544
| FIRE-Final Inspection | 3/14/2007 | 3/15/2007 | 3/15/2007 11:02:20 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD06-03545
| FIRE-Final Inspection | 3/14/2007 | 3/15/2007 | 3/15/2007 11:01:08 AM | A | PASS |
|
|
Fire life safety inspection passed, noted two missing doors at the bathrooms to be installed prior to structural final.
|