ESC10-00119
| General Inspection | 3/15/2010 | 3/15/2010 | 3/16/2010 9:09:35 AM | P | CANC |
|
|
|
ESC08-00491
| Site Final | 3/15/2010 | 3/15/2010 | 3/15/2010 3:30:55 PM | P | NR |
|
|
Still need to re-vegitate the North west of the project area. Spoke with Jeffery V. (RP), will be having seed application occcur here by the end of the week. Will re-inspect for a site final in 2 months.
|
ESC10-00186
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:35:33 PM | P | FAIL |
|
|
Verbal to RP: 1. Clean up all tracking out of the starging area. 2. Install a stabilized Construction Exit out of staging area. 3. Maintain concrete washout pit prior to next pour date. Will re-inspect on 3/17/10AM.
|
ESC10-00075
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:12:46 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00123
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:12:29 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00074
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:12:16 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00122
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:12:05 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00073
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:11:51 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00121
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:11:39 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00072
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:11:27 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00120
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:11:17 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00071
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:11:06 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00069
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:10:54 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00068
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:10:39 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC10-00067
| Tracking Control | 3/15/2010 | 3/15/2010 | 3/15/2010 2:10:26 PM | P | FAIL |
|
|
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
|
ESC09-00791
| BMP Violation | 3/15/2010 | 3/15/2010 | 3/15/2010 1:37:34 PM | P | FAIL |
|
|
Message to RP: Place all concrete wash into the concrete washout pit that has been provided. Will re-inspect on 3/19/10 AM
|
ESC09-00684
| Site Final | 12/15/2009 | 3/15/2010 | 3/15/2010 1:18:17 PM | A | PASS |
|
|
|
ESC08-00924
| General Inspection | 1/15/2010 | 3/15/2010 | 3/15/2010 10:52:14 AM | A | DONE |
|
|
Contacted Kelly Burrows with the issue of permit trasfer from Sommer to the City of Boise Parks and Rec. Also e-mailed him with all the information to trasfer the permit. Will follow up on 3/19/10 AM.
|
ESC10-00031
| General Inspection | 3/12/2010 | 3/15/2010 | 3/15/2010 10:16:50 AM | A | PART |
|
|
Minor sediment still on the hard surface. Nothing entered the drainiage swales dur to the snd bags in plaxce of the gutter cutout.
|
ESC09-00397
| Site Final | 3/12/2010 | 3/15/2010 | 3/15/2010 10:02:57 AM | A | NR |
|
|
Site has not been stabilized. Soon they will be seeding the area of disturb soil. I will re-inspect on 04/17/10AM
|
ESC09-00803
| Site Preparation | 3/15/2010 | 3/15/2010 | 3/15/2010 8:55:16 AM | | PASS |
|
|
|
ESC08-00820
| DOC - Permit Finaled | 3/15/2010 | 3/15/2010 | 3/15/2010 8:55:00 AM | P | PASS |
|
|
|
ESC09-00128
| DOC - Permit Finaled | 3/15/2010 | 3/15/2010 | 3/15/2010 8:54:50 AM | P | PASS |
|
|
|
ESC10-00029
| Site Preparation | 3/15/2010 | 3/15/2010 | 3/15/2010 8:29:10 AM | | PASS |
|
|
All work is interior. No need for storm drai ns to be protected. If anything startes to occur out side of building, will require storm drains to be protected.
|
ESC09-00045
| Site Final | 2/16/2010 | 3/15/2010 | 3/15/2010 7:56:41 AM | A | NR |
|
|
Has not achieved uniform coverage of vegitation over the entire area of disturbance. /Left a message with RP.
|