Inspections for the day of: Thursday, March 15, 2012.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00496 INSP-Sprinkler Rough-in3/15/20123/15/20123/16/2012 4:02:17 PMPPART
Overhead approved for cover at portions of the first floor, second floor corridor and third floor NW rooms 314, 315, 316, laundry and utility rooms as marked and dated on stamped plan set. Discussed obstruction issues with exit sign location at the 3rd floor.
FIR12-00121 INSP-Final Inspection3/15/20123/15/20123/16/2012 3:54:00 PMPPASS
Scope of permit work passed final inspection.
FIR12-00131 INSP-Sprinkler Rough-in3/14/20123/15/20123/16/2012 3:52:23 PMPPART
Overhead work at the remodel area is approved for cover at the drop ceilings.
FIR11-00651 INSP-Sprinkler Rough-in3/15/20123/15/20123/16/2012 3:51:25 PMPPART
Dry system rough-in inspection completed satisfactory.
FIR12-00030 INSP-Sprinkler Rough-in3/14/20123/15/20123/16/2012 10:58:53 AMAPASS
Remainder of overhead rough-in work approved for cover at the drop ceilings.