FIR11-00496
| INSP-Sprinkler Rough-in | 3/15/2012 | 3/15/2012 | 3/16/2012 4:02:17 PM | P | PART |
|
|
Overhead approved for cover at portions of the first floor, second floor corridor and third floor NW rooms 314, 315, 316, laundry and utility rooms as marked and dated on stamped plan set. Discussed obstruction issues with exit sign location at the 3rd floor.
|
FIR12-00121
| INSP-Final Inspection | 3/15/2012 | 3/15/2012 | 3/16/2012 3:54:00 PM | P | PASS |
|
|
Scope of permit work passed final inspection.
|
FIR12-00131
| INSP-Sprinkler Rough-in | 3/14/2012 | 3/15/2012 | 3/16/2012 3:52:23 PM | P | PART |
|
|
Overhead work at the remodel area is approved for cover at the drop ceilings.
|
FIR11-00651
| INSP-Sprinkler Rough-in | 3/15/2012 | 3/15/2012 | 3/16/2012 3:51:25 PM | P | PART |
|
|
Dry system rough-in inspection completed satisfactory.
|
FIR12-00030
| INSP-Sprinkler Rough-in | 3/14/2012 | 3/15/2012 | 3/16/2012 10:58:53 AM | A | PASS |
|
|
Remainder of overhead rough-in work approved for cover at the drop ceilings.
|