FIR12-00054
| INSP-Sprinkler Rough-in | 3/15/2012 | 3/15/2012 | 3/15/2012 3:53:59 PM | P | FAIL |
|
|
Sprinkler heads are blocked by hvac roof penatrations/duct work in three locations. The head spacing shall meet NFPA 13 8.6.5.2.1.2 and 8.6.5.1.2. Unfortunatly some of this work is located in a remote hydraulic area. Also a soffit has been added at the main entry that was not shown on the plans. At this soffit the fitter added two additional heads. This now puts five heads on an 1 1/4" line where the remote area is flowing four heads off of 1 1/2" (1 1/4" branchline with 1 1/2" riser nipples). After speaking with Tim Frost it was determined that plan modifications will be needed prior to a final sign off showing all changes.
|
FIR10-00033
| INSP-Final Inspection | 3/15/2012 | 3/15/2012 | 3/15/2012 2:27:46 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00607
| INSP-Conference | 3/15/2012 | 3/15/2012 | 3/15/2012 2:12:34 PM | P | DONE |
|
|
I spoke to jeff about an additional fitting and elevation change in the piping out on the dock. He was going to get with his designer and then with Tim Frost to verify that the hydraulic calculations were still acceptable.
|
BLD10-01738
| FIRE-Conference | 3/14/2012 | 3/15/2012 | 3/15/2012 2:11:09 PM | A | DONE |
|
|
I stopped at job site and the receptionist contacted Jesse and we spoke over the phone about getting the life safety inspection performed. He stated that the new fire hydrant would not be installed for another 3 weeks. I set up a re-inspection conference for three weeks from now for a follow up.
|
BLD12-00196
| FIRE-Final Inspection | 3/14/2012 | 3/15/2012 | 3/15/2012 9:33:25 AM | A | PASS |
|
|
life safety passed
|