ESC12-00294
| General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 1:47:10 PM | | FAIL |
|
|
LM for RP I was onsite for inspection; Conference with Mike gave verbal: sweep gutters; gater gaurd not installed correctly; trash; maintain washout; maintain material storage prior to next rain (scheduled tonight); entrance used on adjacent lot on south side must either have clean rock installed or stop using it.
|
ESC12-00293
| General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 1:46:53 PM | | FAIL |
|
|
LM for RP I was onsite for inspection; Conference with Mike gave verbal: sweep gutters; gater gaurd not installed correctly; trash; maintain washout; maintain material storage prior to next rain (scheduled tonight); entrance used on adjacent lot on south side must either have clean rock installed or stop using it.
|
ESC12-00292
| General Inspection | 3/15/2013 | 3/15/2013 | 3/19/2013 1:31:59 PM | | FAIL |
|
|
LM for RP that I was onsite conducting inspection and met with Mike to give verbal: Gater gaurd not trenched; clean trash; washout needs maintenance; sweep gutter; material storage needs maintenance prior to next rain event (forecasted tonight); construction entrance on south side needs installed with letter from land owner to use property or fence closed up so it's not used.
|
ESC13-00150
| Random Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 4:32:27 PM | P | FAIL |
|
|
Washout in gutter; entered stormdrain. Spoke to Ryan (RP) 3/18
|
ESC12-01068
| General Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 4:25:59 PM | P | FAIL |
|
|
DI BmP needs maintained/replaced. Inadvertantly formed a channel down the front property line of his property; sweep gutter. LM for RP 3/15
|
ESC12-01003
| General Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 12:35:57 PM | | PASS |
|
|
Waiting for grass to grow
|
ESC12-01167
| Random Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 12:00:00 AM | P | FAIL |
|
|
Silt fence not trenched in adequately; sweep gutter; clean out DI bag on Winter Camp. Called RP 3/18
|