ELE15-02740
| Conference | 3/15/2016 | 3/15/2016 | 3/15/2016 3:45:29 PM | P | DONE |
|
|
Seth Phone #: ###-#### discuss wiring methods. NM cable ok in rooms and from loadcenters to rooms if ran above drywalled corridor, mc cable and conduit in commonareas and feeders will be mc cable. Roof penetrations shall be mc cable transitioned to carflex exiting pitchpockets to RTU's. AFCI protection in rooms and tamper resistant receptacles required inside rooms.
|
ELE16-00222
| Conference | 3/14/2016 | 3/15/2016 | 3/15/2016 2:09:40 PM | P | CANC |
|
|
Andy Phone #: ###-#### needed r/i
|
ELE16-00222
| Electrical Rough-In | 3/15/2016 | 3/15/2016 | 3/15/2016 2:03:25 PM | P | PASS |
|
|
Andy Phone #: ###-#### r/i tgrid ceilings south half from soffit ok
|
ELE15-03901
| Electrical Rough-In | 3/14/2016 | 3/15/2016 | 3/15/2016 1:18:30 PM | A | PASS |
|
|
R/I inspection for walls on 7th floor in server room area and 8th floor east to include interior and exterior walls. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i walls ok see blue highlighted areas on ESI binder
|
ELE15-04011
| Final | 3/14/2016 | 3/15/2016 | 3/15/2016 12:05:27 PM | A | PASS |
|
|
Contact: Mike Mulvahill Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
ELE16-00376
| Electrical Rough-In | 3/14/2016 | 3/15/2016 | 3/15/2016 12:03:49 PM | A | PASS |
|
|
Ceiling Phone #: ###-#### Inspection requested via web by kendall bender r/i t grid ceilings ok
|
ELE16-00824
| Electrical Rough-In | 3/15/2016 | 3/15/2016 | 3/15/2016 10:15:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Blackham r/i ok
|
ELE16-00779
| Final | 3/14/2016 | 3/15/2016 | 3/15/2016 9:57:52 AM | A | FAIL |
|
|
Greg is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 210.8(B)(5)-receptacles within 6 foot of sinks shall have GFCI protection
|
ELE16-00814
| Conference | 3/14/2016 | 3/15/2016 | 3/15/2016 9:39:08 AM | A | DONE |
|
|
Benjamin Phone #: ###-#### discuss wiring methods for residential remodel, securing, stapling, afci, tamper resistant receptacles, box fill etc
|
GCE15-00165
| GCE-Final | 3/14/2016 | 3/15/2016 | 3/15/2016 8:50:31 AM | A | PASS |
|
|
###-#### gate: #2103 garage: 0713 final ok pool work not done
|