FIR17-00043
| INSP-Final Inspection | 3/15/2017 | 3/15/2017 | 3/15/2017 2:59:48 PM | P | FAIL |
|
|
Need ceilings installed and foil removed from the heads.
|
BLD17-00480
| FIRE-Final Inspection | 3/9/2017 | 3/15/2017 | 3/15/2017 2:59:48 PM | A | FAIL |
|
|
See the city approved plans for locations of corrections needed. They include non-functional exit signs, annual inspection for the fire extinguisher, lower the fire extinguisher, door direction swing...ect.
Alaa Phone #: ###-####
|
FIR16-00284
| INSP-Sprinkler Rough-in | 3/14/2017 | 3/15/2017 | 3/15/2017 10:40:48 AM | A | PASS |
|
|
Unit 207 soffit piping passed. Piping can be covered.
|
FIR17-00011
| INSP-Sprinkler Rough-in/Hydro | 3/14/2017 | 3/15/2017 | 3/15/2017 10:39:24 AM | A | PASS |
|
|
Tenting passed. Piping can be covered.
|
BLD17-00170
| FIRE-Final Inspection | 3/14/2017 | 3/15/2017 | 3/15/2017 8:46:19 AM | A | FAIL |
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled. Contractor is going to put up a temporary suite number.
|
FIR17-00060
| INSP-Final Inspection | 3/13/2017 | 3/15/2017 | 3/15/2017 8:34:27 AM | A | PASS |
|
|
Permit finaled
|
FIR17-00099
| INSP-Final Inspection | 3/14/2017 | 3/15/2017 | 3/15/2017 8:33:09 AM | A | FAIL |
|
|
Provide city approved plans/small documents, provide as-builts that match the installation for approval by plan review, provide testing.
|