BLD16-03666
| BLD-Framing/Rough-in | 3/8/2017 | 3/15/2017 | 3/15/2017 4:59:56 PM | P | PART |
|
|
South wing, general walk through of work in progress.
|
BLD16-03666
| BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 4:59:20 PM | P | PART |
|
|
Exterior shear walls. south half. Noted some holdowns not yet fastened on east side. Also one area needs to br nailed that is not attached east side as well.
|
BLD16-02650
| BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 3:23:57 PM | P | PASS |
|
|
Pat Phone #: ###-####. No one on site. Could not locate approved set of plans. No inspection.
|
BLD16-02649
| BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 3:23:37 PM | P | NR |
|
|
Pat Phone #: ###-####. No one on site. Could not locate approved set of plans. No inspection.
|
BLD16-04569
| BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 2:30:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
BLD17-00013
| BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 1:52:02 PM | P | PASS |
|
|
Call 15 mintues before // Rob Phone #: ###-####. Interior steel stud framed wall for new grocery pick up waiting area.
|
BLD17-00002
| BLD-Energy code compliance | 3/15/2017 | 3/15/2017 | 3/15/2017 1:34:38 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
BLD17-00256
| BLD-Final | 3/14/2017 | 3/15/2017 | 3/15/2017 10:45:27 AM | A | DONE |
|
|
Walter Phone #: ###-####
|
BLD17-00256
| DOC - Permit Finaled | 3/15/2017 | 3/15/2017 | 3/15/2017 10:45:18 AM | P | PASS |
|
|
|
BLD16-04422
| BLD-Ceiling Grid Inspection | 3/14/2017 | 3/15/2017 | 3/15/2017 9:51:12 AM | A | PASS |
|
|
Rod Phone #: ###-####
|
BLD17-00142
| BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 9:06:55 AM | A | FAIL |
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez . Fireblock arch in hallway, west side. Ok to insualte. Correction notice posted.
|
BLD16-02880
| BLD-Energy code compliance | 3/14/2017 | 3/15/2017 | 3/15/2017 8:43:17 AM | A | PASS |
|
|
Joel Phone #: ###-####
|