Inspections for the day of: Wednesday, March 15, 2017.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00853 General Inspection3/15/20173/15/20173/16/2017 1:30:49 PM PASS
Trackout okay.
ESC16-00841 General Inspection3/15/20173/15/20173/15/2017 4:23:35 PM PASS
WIP. Small amount of trackout. Project ok.
ESC16-00990 General Inspection3/15/20173/15/20173/15/2017 4:23:15 PM PASS
WIP. Small amount of trackout. Project ok.
ESC16-01201 Site Final3/15/20173/15/20173/15/2017 4:19:41 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC16-01200 Site Final3/15/20173/15/20173/15/2017 4:19:29 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC16-01198 Site Final3/15/20173/15/20173/15/2017 4:19:18 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC16-01186 Site Final3/15/20173/15/20173/15/2017 4:19:06 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC16-01185 Site Final3/15/20173/15/20173/15/2017 4:18:51 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC15-01441 Site Final3/15/20173/15/20173/15/2017 4:18:41 PMPPASS
Landscaping complete. Soil stable. Okay to final.
ESC15-01441 Aging Inspection3/15/20173/15/20173/15/2017 4:18:27 PM PASS
Landscaping complete. Soil stable. Okay to final.
ESC16-00664 Aging Inspection3/15/20173/15/20173/15/2017 4:10:25 PM PASS
No ESC violations. BMPs okay.
ESC17-00226 Site Preparation3/15/20173/15/20173/15/2017 2:31:15 PMPPASS
Met on site with homeowner. Went over BMPs and trackout mitigation. Okay to start
ESC17-00100 Site Preparation3/15/20173/15/20173/15/2017 2:13:08 PMPNR
Not ready to start. No BMPs installed. Needs inlet protection, perimeter controls, and entrance. Spoke with RP. Excavator will install controls before starting work. He will call once the controls are implemented. Sign is posted.
ESC16-01612 General Inspection3/10/20173/15/20173/15/2017 11:39:35 AMAPASS
No ESC issues observed. No trackout.
ESC16-00710 General Inspection3/15/20173/15/20173/15/2017 11:39:05 AM PASS
No ESC issues observed. Trackout and trash contained.
ESC16-00569 Aging Inspection3/15/20173/15/20173/15/2017 11:27:43 AM PASS
No ESC issues observed
ESC16-00359 Aging Inspection3/15/20173/15/20173/15/2017 11:21:13 AM PASS
No ESC issues oberved
ESC15-00731 General Inspection3/15/20173/15/20173/15/2017 10:58:21 AM PASS
Project ok. WIP on interior and exterior. Silt fence ok. No discharges.
ESC16-00849 General Inspection3/15/20173/15/20173/15/2017 10:58:01 AM PASS
Project ok. Foundation poured no other WIP. Silt fence okay.
ESC11-00879 BMP Violation3/8/20173/15/20173/15/2017 10:55:41 AMAPASS
Concrete slurry cleaned up. Excavation started on two remaining lots. Ensure use of washout for further concrete work. No corrections requested.
ESC16-01553 Site Preparation3/14/20173/15/20173/15/2017 10:31:12 AMAPASS
Subdivision BMPs are installed and maintained. Sign is posted. Ensure use of trash containment and concrete wash out are used once needed. Okay to start.
ESC16-01004 Site Final3/15/20173/15/20173/15/2017 10:14:30 AMPPASS
ESC16-01004 General Inspection3/15/20173/15/20173/15/2017 10:13:56 AM PASS
House is finished. Okay to final.
ESC17-00040 Site Preparation3/14/20173/15/20173/15/2017 9:49:13 AMAPASS
Met with Evan onsite. Reviewed plan and inspected site BMPs. Plan to use paved section of project as construction entrance and implement daily sweeping. DI bags are installed. Concrete washout will be installed when concrete work begins. Project okay.
ESC16-00588 Site Final3/15/20173/15/20173/15/2017 9:16:33 AMAPASS
Soil stable
ESC16-00588 Aging Inspection3/15/20173/15/20173/15/2017 9:16:07 AM PASS
Project is finished. Okay to final.