ELE13-03041
| ELE-Aging Inspection | 3/15/2018 | 3/15/2018 | 3/19/2018 7:51:24 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE13-03407
| ELE-Aging Inspection | 3/15/2018 | 3/15/2018 | 3/19/2018 7:50:50 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE17-03900
| Final | 3/14/2018 | 3/15/2018 | 3/15/2018 2:36:07 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok final.
|
ELE18-00497
| Final | 3/15/2018 | 3/15/2018 | 3/15/2018 1:53:37 PM | P | PASS |
|
|
Please call 30 minutes before getting, home is occupied. Call builder. Van at ###-#### Phone #: ###-#### Inspection requested via web by Dustin Kuester Ok final. I talked to Dustin at rough-in stage. Existing garage was torn down and a new garage contructed. Existng garage was fed with a 10-2 UF. The only way to get 2 seperate circuits to garage was to saw cut through concrete patio all the way to new garage. I didnt require seperate circuits do to the cost. Lights and recepts are together. Everything is GFI protected.
|
ELE18-00373
| Final | 3/13/2018 | 3/15/2018 | 3/15/2018 1:26:02 PM | P | PASS |
|
|
Darren Phone #: ###-#### Ok final.
|
ELE17-01197
| Final | 3/15/2018 | 3/15/2018 | 3/15/2018 12:30:40 PM | P | PASS |
|
|
Larry-please call 30 mintues prior for access Phone #: ###-#### Ok final. Kitchen remodel, but smokes were added. They are on ARC fault, and micro has lockout.
|
ELE18-00511
| Final | 3/14/2018 | 3/15/2018 | 3/15/2018 12:07:50 PM | P | PASS |
|
|
Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok final. Overhead mast on garage now has a guy kit installed. Overhead drop from garage to house is now raised right around 3ft.
|
ELE18-00974
| Electrical Rough-In | 3/15/2018 | 3/15/2018 | 3/15/2018 10:41:28 AM | A | PASS |
|
|
Please call half an hour before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok cover kitchen.
|
ELE18-00685
| Electrical Rough-In | 3/14/2018 | 3/15/2018 | 3/15/2018 10:04:03 AM | A | PASS |
|
|
Please call Kevin ###-#### to get someone to meet you there. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover addition on SE corner of house.
|
ELE18-00275
| Electrical Rough-In | 3/14/2018 | 3/15/2018 | 3/15/2018 9:52:27 AM | A | PASS |
|
|
mark Phone #: ###-#### Ok cover. Outlets needed to left and right of door in mstr that exits to patio. Will need to see on final.
|
ELE18-00975
| Electrical Rough-In | 3/15/2018 | 3/15/2018 | 3/15/2018 9:42:04 AM | A | PASS |
|
|
rough in for LED highbays Phone #: ###-#### Inspection requested via web by Tim Dunlop Lighting UL listed. New lighting in main gym area, and in large NW room.
|
ELE18-00956
| Permanent Service | 3/13/2018 | 3/15/2018 | 3/15/2018 9:21:08 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Dean Gernaat Inspection cancelled from web by: Dean Gernaat
|
ELE17-04118
| Final | 3/14/2018 | 3/15/2018 | 3/15/2018 9:20:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok final.
|
ELE12-00989
| Final | 3/15/2018 | 3/15/2018 | 3/15/2018 7:45:33 AM | P | PASS |
|
|
Ok final. Spoke with contractor on 3/13/18, he said corrections were made.
|