Inspections for the day of: Tuesday, March 16, 1999.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-03112 INSP - Concrete3/15/19993/16/19993/16/1999 12:00:00 AMAPART
03/16/99 340 - ###-#### george SLABS
BLD98-03614 INSP - Framing/Rough-in3/15/19993/16/19993/16/1999 12:00:00 AMAFAIL
03/16/99 340 - ###-#### CHARLIE//SEISMIC INSPECT C/N, NEED SPEC INSP REPORTS, JOIST DESIGN, ETC PRIOR TO FINAL, CLG OK, O
BLD98-01574 INSP - Final3/12/19993/16/19993/16/1999 12:00:00 AMAPART
03/16/99 340 - ###-#### JAMES//FINAL need verify other sigs
BLD99-00292 INSP - Framing/Rough-in3/16/19993/16/19993/16/1999 12:00:00 AMAFAIL
03/16/99 340 - DOUG ###-#### PAGER add hails, landings, etc...need plbg r/i.. ok to continue
BLD99-00301 INSP - Wall cover3/15/19993/16/19993/16/1999 12:00:00 AMAPASS
03/16/99 340 - DAVE ###-#### OK, REC'D DETAIL FOR 1 HR WALL AT OVERHANG, OK TO CONTINUE
BLD98-02257 INSP - Final3/16/19993/16/19993/16/1999 12:00:00 AMPFAIL
03/16/99 340 - ###-#### PAT//STRUCTURAL FINAL need elec perm; address access restroom...w.c. ai 24" from wall. ok for
BLD98-02319 INSP - Final3/15/19993/16/19993/16/1999 12:00:00 AMPPASS
03/16/99 340 - unit 2095 Mr Raggs\\###-#### c/n ok, ok for perm occ
BLD98-03642 INSP - Framing/Rough-in3/11/19993/16/19993/16/1999 12:00:00 AMPPART
03/16/99 340 - ###-#### JOHN//PARTIAL FINAL MOVING FROM PHASE I TO PHASE II. ok to move into phase 1
BLD98-03773 INSP - Framing/Rough-in3/15/19993/16/19993/16/1999 12:00:00 AMPPART
03/16/99 340 - LATE PM TOM ###-#### CEILING clg ok
BLD98-03904 INSP - Framing/Rough-in3/16/19993/16/19993/16/1999 12:00:00 AMPNR
03/16/99 340 - RICH ###-#### TEMP OCC nr,
BLD98-03944 INSP - Framing/Rough-in3/16/19993/16/19993/16/1999 12:00:00 AMPNR
03/16/99 340 - STEVE ###-#### nr, gave to 408
BLD98-03952 INSP - Framing/Rough-in3/16/19993/16/19993/16/1999 12:00:00 AMPPART
03/16/99 340 - DAVE ###-#### rec'd eng for masonry openings, ok
BLD99-00160 INSP - Final3/16/19993/16/19993/16/1999 12:00:00 AMPPASS
03/16/99 340 - ###-#### PAT//STRUCTURAL FINAL OK FOR L/C ONLY W/ BLD98-2257
BLD99-00200 INSP - Final3/15/19993/16/19993/16/1999 12:00:00 AMPNR
03/16/99 340 - kim ###-#### nr, sent to 407
BLD99-00201 INSP - Final3/15/19993/16/19993/16/1999 12:00:00 AMPNR
03/16/99 340 - kim ###-#### sent to 407