BLD01-00412
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | FAIL |
|
|
###-#### C/N misc and truss brace corr. 3/16/2001 9:55:00 AM
|
BLD01-00570
| BLD-Conference | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 12:54:52. Contact: ###-####.
|
BLD00-01801
| BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 14:07:34. Contact: ###-####. Temp Occ C/N.....Perm Occ status req within 90 days of this notice. 3/16/2001 11:56:49 AM
|
BLD00-03677
| BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 14:08:34. Contact: ###-####. OK for temp Occ. C/N....Need shell/core finaled. Need perm Occ status within 90 days of this notice. 3/16/2001 11:54:22 AM 3/16/2001 11:58:29 AM
|
BLD01-00047
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PART |
|
|
shear Fred ###-#### Shear OK. 3/16/2001 9:18:22 AM
|
BLD01-00048
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PART |
|
|
shear Fred ###-#### Shear OK. 3/16/2001 9:18:40 AM
|
BLD01-00381
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PART |
|
|
fr richard ###-#### Framing OK.....C/N call for grid insp...will also look at dampers for floor /ceil penitr, firestop at corrid and ten demising walls....ceiling patch (large). 3/16/2001 10:54:47 AM
|
BLD01-00413
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00420
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | A | FAIL |
|
|
###-#### \\LATE AM C/N...Misc and truss brace corr. 3/16/2001 9:53:26 AM
|
BLD01-00095
| BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PART |
|
|
Robert ###-#### Shear OK. 3/16/2001 2:37:59 PM
|
BLD01-00063
| BLD-Foundation | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PASS |
|
|
found- ryan -###-####
|
BLD01-00283
| BLD-Framing/Rough-in | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 08:28:07. Contact: ###-####. Insp of (inside) gyp of (2) 1hr walls.....OK 3/16/2001 3:28:27 PM
|
BLD01-00501
| BLD-Foundation | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PASS |
|
|
###-#### fd ryan
|
BLD00-01531
| BLD-Footing | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PART |
|
|
pouring at 1:30 ###-#### Elevator and front column pads OK pending special insp and approval. 3/16/2001 3:38:30 PM
|
BLD00-03700
| BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PASS |
|
|
GARAGE DOOR IS OPEN ###-#### C/C issued. 3/16/2001 4:06:16 PM
|
BLD00-03700
| BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 12:00:00 AM | P | PASS |
|
|
GARAGE DOOR IS OPEN ###-#### C/C issued. 3/16/2001 4:06:16 PM
|
BLD00-03695
| BLD-Final | 3/14/2001 | 3/16/2001 | 3/15/2000 12:00:00 AM | A | PART |
|
|
###-#### ceiling grid needs some perimeter wires. 3/16/2001 7:41:49 AM
|