FIR03-00659
| INSP-Final Inspection | 3/15/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled 3/16/2004 3:12:46 PM
|
BLD03-00686
| FIRE-Final Inspection | 3/15/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | A | FAIL |
|
|
Mount fire exstinguisher in the mechanical room and tag all extinguishers. Final the fie alarm system 3/16/2004 3:02:30 PM
|
FIR03-00523
| INSP-Final Inspection | 3/15/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | A | FAIL |
|
|
resubmit plans showing the fire smoke dampers. This will include a revised matrix and one line. 3/16/2004 12:36:24 PM
|
FIR03-00729
| INSP-Final Inspection | 3/16/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled
|
FIR03-00317
| INSP-Final Inspection | 3/16/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | P | PASS |
|
|
fire sprinkler underground finaled
|
FIR03-00480
| INSP-Final Inspection | 3/16/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | P | PASS |
|
|
fire sprinkler system finaled
|
FIR02-00359
| INSP-Conference | 4/14/2004 | 3/16/2004 | 3/16/2004 12:00:00 AM | P | DONE |
|
|
I met with the project engineer and the general contractor to discuss items listed on the plan modifications. The items are a/v coverage possibly lacking in areas listed on the plan review comments. Upon field inspection it was determined that a/v coverage was adequate for the listed areas.
|