Inspections for the day of: Wednesday, March 16, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01887 FIRE-Final Inspection3/15/20053/16/20053/16/2005 12:00:00 AMAPASS
fire life safety finaled 3/16/2005 11:12:36 AM
FIR04-00684 INSP-Sprinkler Rough-in/Hydro3/16/20053/16/20053/16/2005 12:00:00 AMAPASS
Attic system roughin is ok. This includes the eaves on the third floor. Changes have been made to the plans that will require resubmittals. This includes an extra layer of piping and heads in the tower, a main re route at the north end and the drive through 3/16/2005 1:22:51 PM
FIR04-00684 INSP-Supply line flush3/16/20053/16/20053/16/2005 12:00:00 AMAPASS
Undergrouund supply flush was not done. Underground and attic system hydro test passed 3/16/2005 11:14:57 AM
BLD05-00372 FIRE-Final Inspection3/15/20053/16/20053/16/2005 12:00:00 AMAFAIL
Provide sticker at door and correct door hardware 3/16/2005 3:31:00 PM
FIR04-00460 INSP-Final Inspection3/15/20053/16/20053/16/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/15/2005 at 10:28:01 AM. Contact: ###-####.
FIR04-00796 INSP-Final Inspection3/16/20053/16/20053/16/2005 12:00:00 AMPPASS
As per plans smoke detectors for door operation were relocated and functioned correctly. The pull station that was shown to be a relocate is actually existing. There is no manual pull station at the exit door of the Link. Per Dan, Mary knows this and is ok with it since it is not a building exit. 3/16/2005 4:59:10 PM
BLD04-02835 FIRE-Final Inspection3/16/20053/16/20053/16/2005 12:00:00 AMPPASS
Life safety finaled 3/16/2005 4:59:51 PM
BLD04-00717 FIRE-Final Inspection3/16/20053/16/20053/16/2005 12:00:00 AMPPASS
Fire life safety finaled 3/16/2005 4:55:00 PM
BLD04-01896 FIRE-Final Inspection3/16/20053/16/20053/16/2005 12:00:00 AMPFAIL
Need to complete items 2, 3 and 4 on the correction notice. This includes fire alarm and fire sprinkler permits. Also need approved door hardware on doors in the office and repair the emergency light in the office corridor. 3/16/2005 4:52:14 PM
MIS05-00030 FIR-Final3/16/20053/16/20053/16/2005 12:00:00 AMPFAIL
Hyechu-; Phone #: ###-#### Door hardware has been completed but the exit signs have not been repaired. 3/16/2005 4:54:18 PM
BLD04-00029 FIRE-Final Inspection3/16/20053/16/20053/16/2005 12:00:00 AMPCANC
danton; Phone #: ###-#### Do not have resubmitted fire sprinkler plans as requested to final fire permits. 3/16/2005 4:53:20 PM
BLD04-02899 FIRE-Conference3/16/20053/16/20053/16/2005 12:00:00 AMPDONE
Contractor wanted to know what was required for the fire alarm portion of the fire inspection 3/16/2005 4:56:28 PM