Inspections for the day of: Thursday, March 16, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-00563 Final3/16/20063/16/20063/16/2006 4:18:20 PMPPASS
Chad -- back door is open; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to final
ELE05-04467 Electrical Rough-In3/16/20063/16/20063/16/2006 2:56:43 PMPPART
Todd -- reinspection for underground; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong called contr, left message, said east part of driveway ok to cover, but north part still not deep enough. Left "cover ok" sticker on panel. left corr notice posted
ELE05-00289 Conference3/15/20063/16/20063/16/2006 2:47:36 PMADONE
greg; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met owner, told he would have to have contractor do wiring on house, called office to void permit.
ELE05-00516 Final3/16/20063/16/20063/16/2006 2:02:25 PMPPASS
chad; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corrections made, water features, hot tub ok. ok to final
ELE06-00858 Final3/16/20063/16/20063/16/2006 1:15:41 PMPFAIL
NEED FINAL ON HOT TUB INSTALLATION. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr, left corr notice, 300.5 non-metallic raceway listed for direct burial without concrete encasement shall be 18" deep
ELE06-00113 Electrical Rough-In3/10/20063/16/20063/16/2006 10:36:34 AMANR
CONTACT: LYLE DEAN - ROUGH IN INSPECTION 6TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy talked to contr, they are not ready
ELE04-01224 ELE-Aging Inspection3/16/20063/16/20063/16/2006 8:52:06 AM DONE
nr
ELE05-04488 Final3/16/20063/16/20063/16/2006 8:19:23 AMAPASS
looked at sign, ok to final