FIR05-00856
| FIR-Aging Inspection | 3/16/2006 | 3/16/2006 | 3/20/2006 2:03:25 PM | | NR |
|
|
I spoke to Chris with SimplexGrinnell he is to follow up on status.
|
FIR06-00143
| INSP-Sprinkler Rough-in/Hydro | 3/16/2006 | 3/16/2006 | 3/17/2006 11:08:12 AM | P | PART |
|
|
Underground piping up to the 11 1/4 is ok to cover. Per contractor the piping is relocated 3' over to be under the new sidewalk and landscaping which will give it a 4'-6" bury.
|
FIR05-00847
| INSP-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 4:13:47 PM | P | FAIL |
|
|
Monitoring company did not receive all of the signals and they do not have information such as address and city. Also could not do the battery calcs. Need to redo the test.
|
FIR05-00771
| INSP-Final Inspection | 3/16/2006 | 3/16/2006 | 3/16/2006 4:05:59 PM | P | FAIL |
|
|
Need pressure relief installed on the wet system and revised calcs
|
BLD05-02319
| FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 4:04:39 PM | P | CANC |
|
|
no time for inspection
|
BLD04-03025
| FIRE-Conference | 3/16/2006 | 3/16/2006 | 3/16/2006 4:02:37 PM | P | DONE |
|
|
The wet stand pipes have been installed as dry temporarily with dave hannimans approval. Signage with gpm and psi requirements have been placed at the fdc. The standpipes are to be converted to wet when the building is enclosed and heated. Work can now continue on the fourth floor and above.
|
FIR05-00644
| INSP-Sprinkler Rough-in | 3/15/2006 | 3/16/2006 | 3/16/2006 4:02:11 PM | A | PART |
|
|
The wet stand pipes have been installed as dry temporarily with dave hannimans approval. Signage with gpm and psi requirements have been placed at the fdc. The standpipes are to be converted to wet when the building is enclosed and heated. Work can now continue on the fourth floor and above.
|
BLD04-03012
| FIRE-Final Inspection | 3/16/2006 | 3/16/2006 | 3/16/2006 3:17:24 PM | P | PASS |
|
|
life safety finaled
|
FIR05-00788
| INSP-Sprinkler Rough-in | 3/15/2006 | 3/16/2006 | 3/16/2006 3:13:28 PM | P | PASS |
|
|
UG inside of building is ok to cover
|
FIR06-00117
| INSP-Sprinkler Rough-in/Hydro | 3/16/2006 | 3/16/2006 | 3/16/2006 1:45:32 PM | P | FAIL |
|
|
insulation is lying on upright sprinkler heads
|
FIR05-00748
| INSP-Final Inspection | 3/16/2006 | 3/16/2006 | 3/16/2006 1:44:59 PM | P | PASS |
|
|
permit finaled
|
BLD00-03014
| FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 10:36:41 AM | A | FAIL |
|
|
Wall layout does not match what is on plans.
|
FIR05-00693
| INSP-Sprinkler Rough-in | 3/15/2006 | 3/16/2006 | 3/16/2006 10:15:38 AM | A | PASS |
|
|
3" pipe rising from the first floor to the penthouse is ok to cover
|
BLD05-02069
| FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 9:19:37 AM | A | PART |
|
|
A temporary occupancy was given until the fire alarm plans have been approved and inspected. Also a MIS permit will be required for the new tenant.
|