BLD08-02243
| BLD-Conference | 3/16/2009 | 3/16/2009 | 3/16/2009 4:58:21 PM | P | NH |
|
|
called,, no answer
|
BLD08-01205
| BLD-Conference | 3/16/2009 | 3/16/2009 | 3/16/2009 4:50:11 PM | P | PEND |
|
|
call plumbing inspector,, he is waiting on specs,, need as soon as possible,, temp occ will run out
|
BLD09-00198
| BLD-Footing | 3/16/2009 | 3/16/2009 | 3/16/2009 4:40:24 PM | P | PASS |
|
|
###-####
|
BLD08-02490
| BLD-Framing/Rough-in | 3/16/2009 | 3/16/2009 | 3/16/2009 2:38:52 PM | P | PASS |
|
|
RICHARD Phone #: ###-#### ceiling grid ok pending trades
|
BLD06-01548
| BLD-Conference | 3/13/2009 | 3/16/2009 | 3/16/2009 1:14:50 PM | A | PART |
|
|
Jon Phone #: ###-#### stair ?s,, will send me an e-mail so I can pass along to George Slane,,B.O.,, need mech rough prior to insulation
|