FIR06-00113
| INSP-Final Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 3:49:04 PM | P | PASS |
|
|
permit finaled
|
FIR09-00321
| INSP-Final Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 3:27:29 PM | P | FAIL |
|
|
The dedicated circuit has been provided but the map and NFPA 72 forms are still needed.
|
FIR06-00209
| INSP-Final Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 2:16:37 PM | P | PASS |
|
|
permit finaled
|
FIR05-00534
| INSP-Final Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 2:14:26 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00105
| INSP-Final Inspection | 3/15/2010 | 3/16/2010 | 3/16/2010 1:11:27 PM | A | PASS |
|
|
Permit finaled. Eol voltage was verified. Zone 1 and Zone 2 were switched. As-builts to be picked up at contractors office by me.
|