Inspections for the day of: Tuesday, March 16, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00191 Site Preparation3/16/20103/16/20103/16/2010 3:45:13 PM NR
ESC10-00119 Complaint Inspection3/16/20103/16/20103/16/2010 1:42:50 PMPFAIL
Verbal to RP:
CLean up all hard surfaces of sediment and debris. RP also said he would have the sweep company sweep the whole project area. Will re-inspect on 3/18/10am
ESC10-00187 Site Preparation3/16/20103/16/20103/16/2010 1:30:57 PM PASS
ESC10-00149 Site Preparation3/15/20103/16/20103/16/2010 9:51:24 AMPPASS
Mike phone
ESC10-00147 Site Preparation3/16/20103/16/20103/16/2010 9:51:14 AM PASS
ESC10-00176 Site Preparation3/16/20103/16/20103/16/2010 9:09:13 AM NR
ESC10-00192 Site Preparation3/15/20103/16/20103/16/2010 8:56:04 AMAFAIL
Verbal to RP:
Post ESC sign where it is visable from the street and also provide a concrete washout pit (internal or external). Will re-inspect on 3/17/10AM.
ESC10-00213 Site Preparation3/15/20103/16/20103/16/2010 8:39:17 AMAPASS
Site looks good. Utilized Gator Gaurd as there sediment barrier.