FIR11-00084
| INSP-Final Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 3:10:53 PM | P | PASS |
|
|
permit finaled
|
FIR11-00083
| INSP-Final Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 3:09:45 PM | P | PASS |
|
|
permit finaled
|
FIR11-00079
| INSP-Final Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 3:09:00 PM | P | PASS |
|
|
permit finaled
|
FIR11-00053
| INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 2:28:35 PM | A | PASS |
|
|
Sprinkler rough-in passed. Before a approval for cover is given the insulation in the joist spaces will need to be inspected.
|
FIR10-00514
| INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 1:52:39 PM | A | PASS |
|
|
The first floor sprinkler piping is ok to cover except at the Lobby area which has not been completed yet.
|
BLD11-00460
| FIRE-Final Inspection | 3/15/2011 | 3/16/2011 | 3/16/2011 10:15:38 AM | A | FAIL |
|
|
Provide a fire extinguisher as discussed. Repaire or remove the exit dign and emergency lights. Remove the deadbolt and provide single action hardware at teh main exit or provide keyed hardware, remove the knob and provide a sticker as discussed.
|
FIR11-00079
| INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 9:30:48 AM | A | PASS |
|
|
sprinkler piping is ok to cover
|
FIR11-00084
| INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 9:29:14 AM | A | PASS |
|
|
sprinkler piping is ok to cover
|
FIR11-00083
| INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 9:28:15 AM | A | PASS |
|
|
sprinkler piping is ok to cover
|
BLD11-00435
| FIRE-Final Inspection | 3/15/2011 | 3/16/2011 | 3/16/2011 9:23:00 AM | A | FAIL |
|
|
Provide single action hardware on two of the three west side exit doors, remove the deadbolts from the east side exit doors and mount the fire extinguishers.
|