FIR11-00575
| INSP-Alarm Testing | 3/16/2012 | 3/16/2012 | 3/16/2012 4:21:56 PM | P | PART |
|
|
Completed testing for correction notice items dated 3/12. Also tested SD above FATC 5 and zones 1 thru 4 HSSD at the sub fab mechanical. Discussed sprinkler monitoring test and building 24D link testing schedule.
|
FIR11-00651
| INSP-Sprinkler Rough-in | 3/16/2012 | 3/16/2012 | 3/16/2012 3:56:35 PM | P | PART |
|
|
Discussed coverage at combustible concealed spaces. Remainder of dry system work at the second floor area okayed.
|
BLD10-02410
| FIRE-Final Inspection | 3/15/2012 | 3/16/2012 | 3/16/2012 10:58:02 AM | A | PASS |
|
|
Fire life safety inspection passed.
|