Inspections for the day of: Wednesday, March 16, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00816 Final3/15/20163/16/20163/16/2016 3:00:58 PMPPASS
Jon Fivecoat is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce
Final ok
ELE16-00816 Permanent Service3/16/20163/16/20163/16/2016 2:52:02 PMPPASS
Jon Fivecoat is contact at ###-####. thank you. Phone #: ###-#### Inspectiion requested via web by Debby Pierce
Existing ground rods ok. p/s u/g rec ok
ELE16-00434 Final3/15/20163/16/20163/16/2016 2:35:03 PMPPASS
Wesley Phone #: ###-#### Final ok
ELE16-00234 Final3/15/20163/16/20163/16/2016 2:10:29 PMPPASS
Phone #: ###-#### Inspection requested via web by Thomas Jenkins
Open boxes for low voltage wiring. Final ok
ELE15-03984 Final3/16/20163/16/20163/16/2016 1:29:13 PMPCANC
would like call ahead; Mike Phone #: ###-#### Contact information from ELE15-03985. Contractor at address on this permit did not request an inspection for today.
ELE16-00826 Electrical Rough-In3/16/20163/16/20163/16/2016 1:14:34 PMPPASS
###-#### Underground to hot tub rough in ok cover
ELE15-03958 Electrical Rough-In3/16/20163/16/20163/16/2016 12:42:56 PMPFAIL
Underground for sign. Phone #: ###-#### Inspection requested via web by Thomas Jenkins
Verbal with on site wireman. 300.5- Minimum depth of under roadway 24". 18 to 20 at time of inspection.
ELE13-00382 ELE-Aging Inspection3/16/20163/16/20163/16/2016 10:35:33 AM PASS
Still under construction
ELE16-00685 Final3/15/20163/16/20163/16/2016 10:29:05 AMAPASS
Request Final Inspection. Gas Detection system wiring. Project is Matheson Trucking. We will be on Site Weds. Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence Final ok
ELE16-00685 Electrical Rough-In3/16/20163/16/20163/16/2016 10:19:33 AMPPASS
Request Final Inspection. Gas Detection system wiring. Project is Matheson Trucking. We will be on Site Weds. Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence
Natural gas repair area, ventilation provided through out all ceiling areas to unclassify area as per 511(C)(2). Space 4 rough in ok.
ELE16-00833 Electrical Rough-In3/15/20163/16/20163/16/2016 9:37:39 AMAPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI
Wall rough in dividing front show room from back area rough in ok cover
ELE15-03396 Electrical Rough-In3/15/20163/16/20163/16/2016 9:16:27 AMAPASS
Mike Phone #: ###-####
North and west underground for parking lot lights, guest bathrooms, office near guest bath, and entry walls and hardlids
ELE16-00834 Temporary Service3/15/20163/16/20163/16/2016 8:38:22 AMAPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI
t/s u/g n ok
ELE15-03321 Electrical Rough-In3/15/20163/16/20163/15/2016 12:02:02 PMACANC
ceiling inspection Phone #: ###-#### >> Inspection requested via web by Bryan Atkins Inspection cancelled from web by: Bryan Atkins