FIR15-00602
| INSP-Sprinkler Rough-in | 3/15/2016 | 3/16/2016 | 3/16/2016 5:04:11 PM | A | PART |
|
|
Partial rough to cover approved for underground supply mains, holes were still being cored in the footing for the stub in to the building at tine of inspection. Cover is approved up to the 90 degree fittings for the stub in, contractor will schedule inspection for complete cover when thrust blocks/piping is installed for stub in through footing.
|
BLD15-04368
| FIRE-Final Inspection | 3/14/2016 | 3/16/2016 | 3/16/2016 1:45:39 PM | P | PASS |
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher in place with current inspection tag. Final life fire safety inspection passed/complete.
|
FIR16-00029
| INSP-Final Inspection | 3/16/2016 | 3/16/2016 | 3/16/2016 1:44:10 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00030
| INSP-Final Inspection | 3/14/2016 | 3/16/2016 | 3/16/2016 1:43:24 PM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete
|
FIR15-00561
| INSP-Sprinkler Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 12:50:15 PM | P | PASS |
|
|
Rough to cover inspection for elevator equipment on 1st floor complete, elevator equipment room fire sprinkler piping approved for cover. Notated area for cover with red ink on city approved drawings.
|
BLD15-02409
| FIRE-Final Inspection | 3/15/2016 | 3/16/2016 | 3/16/2016 10:07:11 AM | A | PASS |
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers have current inspection tags and are in place. Life fire safety inspection passed/complete.
|
FIR16-00025
| INSP-Final Inspection | 3/15/2016 | 3/16/2016 | 3/16/2016 9:49:43 AM | A | PASS |
|
|
Final fire alarm inspection passed/complete
|