NAF16-00084
| INSP-Sprinkler Rough-in | 3/16/2017 | 3/16/2017 | 3/16/2017 11:58:45 AM | A | PART |
|
|
Completed rough-in on wet and dry system for south wing up to common area (see site plans). *One drop in hallway missing to be verified at tenting inspection.* *Baffles required for dry system to be verified at tenting* *Eaves are currently open to rest of ceiling space as indicated in plan review response for item 2*
|