ELE20-00115
| Final | 3/16/2020 | 3/16/2020 | 3/16/2020 2:31:49 PM | P | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Corrections made final ok
|
ELE19-01571
| Final | 3/13/2020 | 3/16/2020 | 3/16/2020 2:01:04 PM | P | NR |
|
|
Please contact Erick Baker at ###-####, he is the electrician on site. Phone #: ###-#### Inspection requested via web by Deb Gooden Add receps in pantry, Remove open bulb light from Master closet, Safe off all stubbed wires around exterior of home, Finish programing lighting control(Need all code required lights to opperate from switch location, Safe all wire stubbs inside home.
|
ELE20-00677
| Final | 3/13/2020 | 3/16/2020 | 3/16/2020 10:47:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremiah Mitchell final ok
|
ELE20-00906
| Electrical Rough-In | 3/14/2020 | 3/16/2020 | 3/16/2020 10:38:46 AM | A | PASS |
|
|
Have a great day. Phone #: ###-#### Inspection requested via web by TRENT Swaim Whole house rewire rough in ok. (Check for recep under Meter/main at final)
|
ELE20-00787
| Electrical Rough-In | 3/12/2020 | 3/16/2020 | 3/16/2020 9:46:24 AM | A | PASS |
|
|
Please call Mike @ number listed 30 min before arriving for entry into inspection area. Phone #: ###-#### Inspection requested via web by Tye Thomas ufer/Grounding ok to cover
|
ELE20-00904
| Permanent Service | 3/13/2020 | 3/16/2020 | 3/16/2020 9:20:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nick Larson p/s u/g n ok
|
ELE20-00904
| Electrical Rough-In | 3/13/2020 | 3/16/2020 | 3/16/2020 9:20:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nick Larson rough in ok
|
ELE20-00891
| Final | 3/14/2020 | 3/16/2020 | 3/16/2020 9:19:50 AM | A | PASS |
|
|
Inspect a new panel. 1 phase of the main breaker stopped working, changed out the panel.
* I will be there.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Final ok
|
ELE20-00891
| Permanent Service | 3/16/2020 | 3/16/2020 | 3/16/2020 9:19:36 AM | P | PASS |
|
|
Inspect a new panel. 1 phase of the main breaker stopped working, changed out the panel.
* I will be there.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Service change was done on a weekend. Re-energized. p/s u/g rec ok
|
ELE17-03882
| Final | 3/16/2020 | 3/16/2020 | 3/16/2020 8:57:43 AM | A | PASS |
|
|
Monument sign final Sign is cord and plug connected, Recep only final ok
|
ELE20-00787
| Rough-In Permanent Service | 3/12/2020 | 3/16/2020 | 3/12/2020 7:28:47 AM | A | CANC |
|
|
Please call Mike @ number listed 30 min before arriving for entry into inspection area. Phone #: ###-#### >> Inspection requested via web by Tye Thomas Inspection cancelled from web by: Tye Thomas
|