BLD97-01243
| INSP-Sprinkler Rough-in/Hydro | 3/16/1998 | 3/17/1998 | 3/17/1998 12:00:00 AM | A | PASS |
|
|
###-####-shelly undergound, FDC and sprinkler system hydro passed.
|
BLD97-01324
| INSP-Sprinkler Rough-in/Hydro | 3/17/1998 | 3/17/1998 | 3/17/1998 12:00:00 AM | A | PART |
|
|
attic rough-in okay. Shilo informed of requirement for inspector to check tenting of piping going through unheated attic area.
|
BLD97-01324
| INSP-Supply line flush | 3/12/1998 | 3/17/1998 | 3/17/1998 12:00:00 AM | A | NR |
|
|
shilo - cw moore United Water wasn't requested to open key valve. will request a flush when UW can make it.
|
BLD97-01324
| INSP-Supply line flush | 3/17/1998 | 3/17/1998 | 3/17/1998 12:00:00 AM | P | PASS |
|
|
|