BLD98-03661
| FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | A | FAIL |
|
|
JIM ###-#### FIRE FN Not a final inspection- conferencce. 3/20/00 10:27:52 AM
|
BLD99-00961
| FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/16/2000 at 15:19:53. Contact: ###-####.
|
BLD99-02559
| FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | A | PASS |
|
|
###-#### Greg
|
FIR00-00057
| INSP-Supply line flush | 3/17/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | P | PASS |
|
|
flush okay
|
BLD98-03343
| FIRE-Final Inspection | 3/17/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | P | PART |
|
|
###-#### mike Phase 1 ok. 3/20/00 10:27:34 AM
|
BLD99-02817
| FIRE-Final Inspection | 3/17/2000 | 3/17/2000 | 3/17/2000 12:00:00 AM | P | FAIL |
|
|
c/n issued
|