ELE08-00597
| Electrical Rough-In | 3/17/2008 | 3/17/2008 | 3/18/2008 7:42:24 AM | P | PART |
|
|
Inspection is for floor joist area between first and second floor that will be covered. Thanks John Phone #: ###-#### Internet Inspection Request from: John Edwards floor joist area between first and second floor ok
|
ELE08-00531
| Electrical Rough-In | 3/17/2008 | 3/17/2008 | 3/17/2008 3:41:58 PM | P | PART |
|
|
partial trench inspection Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA from pole to transformer pad ok
|
ELE08-00633
| Temporary Service | 3/17/2008 | 3/17/2008 | 3/17/2008 3:23:52 PM | P | PASS |
|
|
hz Pat - possible remodel with out bld permit Phone #: ###-#### T/S O/H Ok
|
ELE08-00613
| Conference | 3/13/2008 | 3/17/2008 | 3/17/2008 2:58:56 PM | P | PART |
|
|
Billy Peace is contact ###-#### Phone #: ###-#### Internet Inspection Request from: Debby Ellis talked about general requirements
|
ELE08-00605
| Permanent Service | 3/17/2008 | 3/17/2008 | 3/17/2008 2:10:35 PM | P | PASS |
|
|
keith Phone #: ###-#### P/S O/H R Ok
|
ELE08-00100
| Electrical Rough-In | 3/17/2008 | 3/17/2008 | 3/17/2008 1:27:48 PM | P | FAIL |
|
|
Ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Todd Sellman properly support raceways and cables install covers seal unused openings and remove unused low voltage cables.
|
ELE07-03251
| Final | 3/14/2008 | 3/17/2008 | 3/17/2008 10:27:37 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jim Williams
|
ELE07-03195
| Final | 3/14/2008 | 3/17/2008 | 3/17/2008 10:05:34 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jim Williams
|
ELE07-03919
| Electrical Rough-In | 3/14/2008 | 3/17/2008 | 3/17/2008 9:17:10 AM | A | PASS |
|
|
Need a rough-in inspection on floor heat in the master bath please, thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS floor heat ok
|