Inspections for the day of: Tuesday, March 17, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-04183 DOC - Permit Finaled3/17/20093/17/20093/17/2009 4:00:24 PMPPASS
ELE08-02432 ELE-Aging Inspection3/17/20093/17/20093/17/2009 3:35:15 PM NR
suc
ELE08-02815 Final3/16/20093/17/20093/17/2009 3:08:43 PMPPASS
Joyce- home after 3 Phone #: ###-####
ELE07-04150 Final3/17/20093/17/20093/17/2009 2:50:45 PMPPASS
ELE07-04150 DOC - Permit Finaled3/17/20093/17/20093/17/2009 2:50:37 PMPPASS
ELE09-00326 Electrical Rough-In3/16/20093/17/20093/17/2009 2:29:20 PMPFAIL
Kathy ###-####//please call 20 min. prior to meet
box fill, screws not permited inside nm boxes, boxes over filled, parallel protection of romex, and free conductor.
ESC08-00739 General Inspection3/17/20093/17/20093/17/2009 1:07:00 PMPPASS
looks ok
ELE09-00035 Permanent Service3/17/20093/17/20093/17/2009 1:06:41 PMPFAIL
High Pat,
Mucho is ready for his service inspection. I have listed his phone number, give him a call and he can walk you through the service work we did. If you can''t get ahold of him you can call me at ###-####. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig
connect transformer to the grounding electrode system
ELE08-02758 Conference3/16/20093/17/20093/17/2009 10:51:01 AMAPART
Chris- After 10 please- call 30 mins prior to going Phone #: ###-####
talked about general requirements.
ELE09-00291 Final3/17/20093/17/20093/17/2009 8:59:06 AMAPASS
ELE09-00291 DOC - Permit Finaled3/17/20093/17/20093/17/2009 8:58:59 AMPPASS
ELE09-00388 Final3/16/20093/17/20093/17/2009 8:36:28 AMANR
Will Phone #: ###-####
this should have been for a service inspection
ELE09-00388 Permanent Service3/17/20093/17/20093/17/2009 8:35:09 AMAPASS
Will Phone #: ###-####
P/S O/H N Ok