BLD09-02104
| BLD-Framing/Rough-in | 3/16/2010 | 3/17/2010 | 3/17/2010 4:42:59 PM | P | NR |
|
|
As late as possible-Andy Steel stud framing inspection Phone #: ###-####. Needs elec and fire sprinkler rough in inspections.
|
ESC10-00116
| Tracking Control | 3/17/2010 | 3/17/2010 | 3/17/2010 4:22:35 PM | P | PASS |
|
|
Contracotr has just finished site maintenance. No trackout at this time.
|
ESC10-00113
| Tracking Control | 3/17/2010 | 3/17/2010 | 3/17/2010 4:22:17 PM | P | PASS |
|
|
Contracotr has just finished site maintenance. No trackout at this time.
|
ESC10-00112
| Tracking Control | 3/17/2010 | 3/17/2010 | 3/17/2010 4:22:03 PM | P | PASS |
|
|
Contracotr has just finished site maintenance. No trackout at this time.
|
BLD10-00271
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:20:21 PM | P | PASS |
|
|
Interior footings and column pad footings.
|
BLD10-00270
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:20:00 PM | P | PASS |
|
|
Interior footings and column pad footings.
|
BLD10-00268
| BLD-Foundation | 3/17/2010 | 3/17/2010 | 3/17/2010 4:19:39 PM | P | PASS |
|
|
Interior footings and column pad footings.
|
BLD10-00278
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:17:18 PM | P | CANC |
|
|
Bill//under slab footing insp Phone #: ###-####.
|
BLD10-00278
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:17:05 PM | P | CANC |
|
|
|
BLD10-00277
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:12:04 PM | P | CANC |
|
|
Bill//under slab footing insp Phone #: ###-####.wrong permit called in.
|
BLD10-00276
| BLD-Footing | 3/17/2010 | 3/17/2010 | 3/17/2010 4:11:43 PM | P | CANC |
|
|
Bill//under slab footing insp Phone #: ###-####. wrong permit called in.
|
BLD10-00183
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 4:08:17 PM | P | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####.Meeting with framing contractor to discuss firewall transition from single story to two story units.
|
BLD10-00182
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 4:07:56 PM | P | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####.Meeting with framing contractor to discuss firewall transition from single story to two story units.
|
BLD10-00181
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 4:07:18 PM | P | CANC |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Meeting with framing contractor to discuss firewall transition from single story to two story units.
|
BLD10-00180
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 4:06:44 PM | P | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Meeting with framing contractor to discuss firewall transition from single story to two story units.
|
BLD10-00418
| BLD-Framing/Rough-in | 3/15/2010 | 3/17/2010 | 3/17/2010 3:54:15 PM | P | PASS |
|
|
Steve-Early afternoon please Phone #: ###-####. Interior steel stud framed walls.
|
ESC10-00050
| Random Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 2:46:07 PM | P | PASS |
|
|
|
BLD10-00130
| BLD-Energy code compliance | 3/17/2010 | 3/17/2010 | 3/17/2010 2:45:07 PM | P | PASS |
|
|
rustin Phone #: ###-####
|
ESC10-00018
| General Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 11:46:04 AM | A | PASS |
|
|
|
BLD10-00071
| BLD-Framing/Rough-in | 3/15/2010 | 3/17/2010 | 3/17/2010 11:45:41 AM | A | FAIL |
|
|
Alan Phone #: ###-####. Needs to provide engineering for open web joist and draft stop at open web joist. c/n posted. ok to insulate.
|
ESC06-00472
| Random Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 11:00:55 AM | A | PASS |
|
|
ESC permit sign is posted. BMP's in place. Site was clean.
|
BLD10-00218
| BLD-Wall cover | 3/16/2010 | 3/17/2010 | 3/17/2010 11:00:08 AM | A | PART |
|
|
Exterior Wall Inspection. All OSB has been replaced. Need approval to cover/side. Thanks Scott Inspection requested from web by: Scott Zierler Phone #: ###-####. Appears that osb has been replaced as per engineers report.
|
ESC05-01653
| Site Preparation | 3/17/2010 | 3/17/2010 | 3/17/2010 10:28:51 AM | A | PASS |
|
|
ESC permit sign posted. BMP's ok.
|
BLD10-00003
| BLD-Framing/Rough-in | 3/16/2010 | 3/17/2010 | 3/17/2010 10:28:25 AM | A | PASS |
|
|
Please contact Scott for access. Inspection requested from web by: Scott Zierler Phone #: ###-####. ok to insulate.
|
BLD10-00179
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 9:47:47 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####.Face layer, both sides of 5/8 type x rock for 2hr. firewall. 1st. floor completed. Inspected base layer on remaining side
|
BLD10-00178
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 9:47:14 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Face layer, both sides of 5/8 type x rock for 2hr. firewall. 1st. floor completed. Inspected base layer on remaining side yesterday.
|
BLD10-00177
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 9:45:09 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Face layer, both sides of 5/8 type x rock for 2hr. firewall. 1st. floor completed. Inspected base layer on remaining side yesterday.
|
BLD10-00176
| BLD-Framing/Rough-in | 3/17/2010 | 3/17/2010 | 3/17/2010 9:43:03 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. Face layer both sides, 5/8 type x rock for 2hr. firewall. 1st. floor completed. Inspected base layer on remaining side yesterday.
|
BLD09-00895
| BLD-Aging Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 8:30:46 AM | | PASS |
|
|
Work in progress. Work progress slow due to boise school dist. project.
|
ESC06-01265
| Aging Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 8:28:59 AM | | DONE |
|
|
|
ESC06-01265
| DOC - Permit Expired | 3/17/2010 | 3/17/2010 | 3/17/2010 8:28:49 AM | A | PASS |
|
|
Final stabalization was completed. Permit is expired.
|