ELE14-02629
| Final | 3/17/2015 | 3/17/2015 | 3/19/2015 11:20:13 AM | P | FAIL |
|
|
Jon Fivecoat is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce NEC 110.3(B) Installation, Generator not installed with proper air flow clearances as per manufactures requirements
|
ELE14-03058
| Final | 3/17/2015 | 3/17/2015 | 3/17/2015 4:32:28 PM | P | FAIL |
|
|
Jay Phone #: ###-#### NEC 210.8 receptacle layout for kitchen counter top, Disconnecting means for detacted garage
|
ELE15-00108
| Final | 3/17/2015 | 3/17/2015 | 3/17/2015 3:14:16 PM | P | FAIL |
|
|
Kara Phone #: ###-#### Habitable living areas shall comply with article 210.8 of the NEC for receptacle spacing.
|
ELE15-00622
| Temporary Service | 3/17/2015 | 3/17/2015 | 3/17/2015 1:49:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov t/s u/g n ok
|