ESC14-00841
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 4:13:52 PM | | PASS |
|
|
Triplett townhome in progress. Trash contained, no spills or nonstormwater discharges observed, and access road was swept this weekend.
|
ESC14-00844
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 4:13:39 PM | | PASS |
|
|
Triplett townhome in progress. Trash contained, no spills or nonstormwater discharges observed, and access road was swept this weekend.
|
ESC13-01279
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 3:53:27 PM | | PART |
|
|
Lucky Harris 13 subdivision streets and gutters are clean and stormdrain inlets have sediment capture bags. Work on homes is now underway and work is staying within confines of area of disturbance and perimeter BMPs are in place.
Corrections: 1. Repair section of downed silt fence 2. Install inlet protection on the stormdrains on the shared driveways (or provide alternative BMP)
|
ESC13-00592
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 3:32:00 PM | P | PEND |
|
|
Need to remove silt fence or repair damaged areas to prepare for future devlopment...
|
ESC14-00381
| General Inspection | 3/16/2015 | 3/17/2015 | 3/17/2015 3:30:17 PM | A | PASS |
|
|
WIP on moving stockpile and rocks. Still need to install all BMPs for full operation under ESC15-00094. No sediment runoff or trackout occuring at site. Will check with BMP installation later this week with JH Development.
|
ESC14-00057
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 2:04:29 PM | | PASS |
|
|
Mattress Firm is complete, landscaped, and contractor has removed temporary BMPs on its parcel, and has cleaned up the work area. No further inspections required on this permit. Conditions satisfied.
The remaining silt fence and DI bags are installed under ESC13-00592, which is still open.
|
ESC14-00057
| DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 2:02:52 PM | P | PASS |
|
|
|
ESC15-00227
| Site Preparation | 3/16/2015 | 3/17/2015 | 3/17/2015 12:37:29 PM | P | PASS |
|
|
RP/GC scheduled 1 PM
Permit posted. Small addition. Stockpile for new foundation area will be stored temporarily in back yard, which has berm barrier that is self contained.
RP/GC familiar with ESC conditions. Main BMP will be housekeeping. Approved to start project.
|
ESC14-00716
| DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 10:25:28 AM | P | PASS |
|
|
|
ESC14-00716
| Site Final | 3/17/2015 | 3/17/2015 | 3/17/2015 10:24:44 AM | P | PASS |
|
|
All earthwork and landscaping for 4-plex complete. Temp. Occupancy granted, building still requires painting. Area has been cleaned of construction materials and loose sediment. Storm drains still have inlet protection for ongoing work.
|
ESC14-00840
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 10:23:00 AM | | PASS |
|
|
Aberdeen carport complete and in use by tenants. Landscaping and parking lot sweeping have been conducted. Lots will be swept again later this week. No further ESC inspections required.
|
ESC14-00840
| DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 10:22:52 AM | P | PASS |
|
|
|
ESC14-00843
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 10:22:22 AM | | PASS |
|
|
Aberdeen carport complete and in use by tenants. Landscaping and parking lot sweeping have been conducted. Lots will be swept again later this week. No further ESC inspections required.
|
ESC14-00843
| DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 10:22:09 AM | P | PASS |
|
|
|
ESC14-00842
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 10:21:35 AM | | PASS |
|
|
Aberdeen carport complete and in use by tenants. Landscaping and parking lot sweeping have been conducted. Lots will be swept again later this week. No further ESC inspections required.
|
ESC14-00842
| DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 10:19:56 AM | P | PASS |
|
|
|
ESC14-00766
| Aging Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 9:30:40 AM | | PASS |
|
|
|
ESC14-00462
| General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 9:11:11 AM | | PASS |
|
|
WIP. Home near completion. Not yet landscaped in front yard. Perimeter wattle and construction fencing is still installed and keeping sediment on site. No corrections required.
|
ESC13-01160
| Site Preparation | 3/16/2015 | 3/17/2015 | 3/16/2015 1:10:31 PM | P | CANC |
|
|
data entry error
|