Inspections for the day of: Thursday, March 17, 2016.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00185 Conference3/17/20163/17/20163/17/2016 2:56:56 PMPDONE
Max Phone #: ###-#### discuss hanger wiring methods. Max taking over project, asked him to ask Kevin P. to confirm hazardous location classification for this hanger. Fire pump conduits prevoisly installed ok . No breaks in conduits below 18inches. Follow article 513 in NEC.
ELE16-00856 Electrical Rough-In3/17/20163/17/20163/17/2016 12:16:27 PMPPASS
Final is needed. Phone #: ###-#### Inspection requested via web by Stuart Welton r/i ok
ELE16-00856 Final3/17/20163/17/20163/17/2016 12:15:51 PMPPASS
Final is needed. Phone #: ###-#### Inspection requested via web by Stuart Welton final ok
ELE14-03316 Conference3/16/20163/17/20163/17/2016 10:13:06 AMADONE
Confirm what is necessary for permanent power MSSC,MSSD,MSSE Phone #: ###-#### Inspection requested via web by Tom Betty discuss energizing gear noted above to keep project progressing. Tom will make x former room totally lockable, will make main electrical room lockable, accessable to electricians only, will lock off all other distribution. Will call for inspection prior to energizing any loadcenters,panelboards or buss duct. Performance testing completed already on medium voltage wiring, transformers and 480 volt main disconnects. Tom will call for electrical r/i when ready to energize.
ELE16-00851 Permanent Service3/16/20163/17/20163/17/2016 8:19:31 AMAPASS
Permanent service inspection, final for Idaho power connection Phone #: ###-#### Inspection requested via web by Jarod Murray p/s o/h n ok garage
ELE16-00855 Temporary Service3/16/20163/17/20163/17/2016 8:02:25 AMAPASS
Phone #: ###-#### Inspection requested via web by PAUL PINNEY t/s u/g n ok