ELE16-00185
| Conference | 3/17/2016 | 3/17/2016 | 3/17/2016 2:56:56 PM | P | DONE |
|
|
Max Phone #: ###-#### discuss hanger wiring methods. Max taking over project, asked him to ask Kevin P. to confirm hazardous location classification for this hanger. Fire pump conduits prevoisly installed ok . No breaks in conduits below 18inches. Follow article 513 in NEC.
|
ELE16-00856
| Electrical Rough-In | 3/17/2016 | 3/17/2016 | 3/17/2016 12:16:27 PM | P | PASS |
|
|
Final is needed. Phone #: ###-#### Inspection requested via web by Stuart Welton r/i ok
|
ELE16-00856
| Final | 3/17/2016 | 3/17/2016 | 3/17/2016 12:15:51 PM | P | PASS |
|
|
Final is needed. Phone #: ###-#### Inspection requested via web by Stuart Welton final ok
|
ELE14-03316
| Conference | 3/16/2016 | 3/17/2016 | 3/17/2016 10:13:06 AM | A | DONE |
|
|
Confirm what is necessary for permanent power MSSC,MSSD,MSSE Phone #: ###-#### Inspection requested via web by Tom Betty discuss energizing gear noted above to keep project progressing. Tom will make x former room totally lockable, will make main electrical room lockable, accessable to electricians only, will lock off all other distribution. Will call for inspection prior to energizing any loadcenters,panelboards or buss duct. Performance testing completed already on medium voltage wiring, transformers and 480 volt main disconnects. Tom will call for electrical r/i when ready to energize.
|
ELE16-00851
| Permanent Service | 3/16/2016 | 3/17/2016 | 3/17/2016 8:19:31 AM | A | PASS |
|
|
Permanent service inspection, final for Idaho power connection Phone #: ###-#### Inspection requested via web by Jarod Murray p/s o/h n ok garage
|
ELE16-00855
| Temporary Service | 3/16/2016 | 3/17/2016 | 3/17/2016 8:02:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by PAUL PINNEY t/s u/g n ok
|