BLD12-03170
| BLD-Conference | 3/4/2016 | 3/11/2016 | | A | |
|
|
|
BLD15-04264
| BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | | P | |
|
|
Jeff Phone #: ###-####
|
GCB15-00069
| GCB-Shearwall | 3/17/2016 | 3/17/2016 | 3/17/2016 2:14:29 PM | P | PASS |
|
|
Rick ###-####
|
BLD16-00551
| BLD-Final | 3/16/2016 | 3/17/2016 | 3/17/2016 1:35:53 PM | P | PASS |
|
|
Larry Phone #: ###-####. Ok for perm occ. N/A on Electrical Permit.
|
BLD15-04110
| BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 10:18:32 AM | A | PART |
|
|
Brad Phone #: ###-####. Still needs to access behind the 2nd floor chase for insualtion. ok to insulate.
|
BLD16-00572
| BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 9:48:24 AM | A | PASS |
|
|
Malloya Phone #: ###-####
|
BLD15-03399
| BLD-Foundation | 3/16/2016 | 3/17/2016 | 3/17/2016 9:48:24 AM | A | PASS |
|
|
Bert Phone #: ###-####. Interior footing for masonry wall ok.
|
BLD16-00572
| BLD-Energy code compliance | 3/17/2016 | 3/17/2016 | 3/17/2016 9:48:14 AM | A | PASS |
|
|
Malloya Phone #: ###-####
|