BLD98-03705
| BLD-Footing | 3/15/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 15:56:16. Contact: . MTI onsite, ok pend report. 3/18/2002 11:13:45 AM
|
MIS01-00246
| BLD-Final | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | NR |
|
|
fn dean ###-#### nr for final...need verify actual bldg permit as there is no description of work...elec? windows? roof was burned. 3/18/2002 2:00:23 PM
|
BLD00-03729
| BLD-Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
###-#### bruce re doors at Cana chapel...add 20 min leaves at pair w / louvers 3/18/2002 4:53:40 PM
|
MIS01-00246
| BLD-Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/18/2002 2:00:46 PM ...need bld permit, called owner. 3/18/2002 4:15:42 PM
|
BLD99-02419
| BLD-Conference | 3/15/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 3/15/2002 4:01:30 PM unable to contact 3/22/2002 4:09:16 PM
|